Building a 10m x 2m Steel & Concrete Footbridge

In summary, you need a 10mX2m foot bridge over a river made from steel and concrete, also to include foundation design. borehole data are as follows. Depth. Description 0.2M Topsoil 2.60M Loose silty sand 4
  • #1
bigtam
2
0
hey ppl,
In a nutshell, need to come up with a 10mX2m foot bridge over a river made from steel and concrete

also to include foundation design.

borehole data are as follows.

Depth. Description

0.2M Topsoil
2.60M Loose silty sand
4.56M Boulder clay

water was met 1M below ground level.

any ideas?

trying to work to BS4 prt1 2005
trying to take into account that a max of 10 people maybe on this at one time.

Thanks guy's
 
Engineering news on Phys.org
  • #2
Looks like coursework?

So what are your initial ideas?
 
  • #3
bigtam said:
hey ppl,
In a nutshell, need to come up with a 10mX2m foot bridge over a river made from steel and concrete

also to include foundation design.

borehole data are as follows.

Depth. Description

0.2M Topsoil
2.60M Loose silty sand
4.56M Boulder clay

water was met 1M below ground level.

any ideas?

trying to work to BS4 prt1 2005
trying to take into account that a max of 10 people maybe on this at one time.

Thanks guy's

My apologies for this but I can't resist. Why do you need a bridge over a stream made of concrete and steel?
I am aware that English my not be your native tongue, in English we need to get the adjectives next to the word they describe. Perhaps;
" 2mX10m steel and concrete bridge over a river" is what you mean.

Sorry for the distraction.
 
  • #4
does it have a requirement for functionality or minimum weight bearing or anything like that? if not it's just like drafting and u can draw any bridge u want... >_>
 
  • #5
quantumdoodle said:
does it have a requirement for functionality or minimum weight bearing or anything like that?

"trying to take into account that a max of 10 people maybe on this at one time." Assume 100kg a person (to be safe, 225lbs) or more would give you a load estimate.

Do you have any ideas where to start?
 
  • #6
Studiot said:
Looks like coursework?

So what are your initial ideas?



Well for a starting point,
using two steel I beams as the main support ontop of a concrete abutment at each end.

Aiming for more functionality as apposed to aethstetic's.

unsure where to start for the calculations to be honest.
(trying to factor in hand rails and decking also but unsure on BS on the overall bulding of this)
 
  • #7
Well I would start with a X section of the stream valley.

Your borehole data is useless without relation to the section.

Then you can roughly locate the foundations on the section.

Then you can get the effective span.

Then I would get a rough idea of the foundation loads = foundation weight + dead + super dead + live. (times partial factors as set out in the BS)
Assumptions about the size of the bridge would need to be made for this.

This will give you foundation pressures so you can design the foundation areas to suit.
You may have to take the founds lower to avoid undercutting by groundwater or the stream. Again this is why you need the section.

This should get you started.
 
  • #8
bigtam,

Another way to start might be to list all the features you think are required. Then arrange them in order of importance.

Certainly from an engineering point of view you need to determine the loading: people, snow, wind, seismic, and whatever else, handrail loads from people, vehicles. Most of that is usually dictated by a building code. I can be argued that "correctly" determining the load requirements is more challenging than the design of the bridge itself.

In terms of a beam or bridge span remember that depth is a key, and note that handrails are usually 3 feet high, take advantage of that if you can.
 

What materials are typically used to build a steel and concrete footbridge?

The main materials used in the construction of a steel and concrete footbridge are steel and concrete. The steel is used for the structural support and framework of the bridge, while the concrete is used for the decking and walking surface. Other materials such as bolts, nuts, and welding materials may also be used in the construction process.

How long does it take to build a 10m x 2m steel and concrete footbridge?

The time it takes to build a 10m x 2m steel and concrete footbridge can vary depending on factors such as the complexity of the design, site conditions, and weather. On average, it can take anywhere from 6-12 months to complete the construction of a footbridge of this size.

What is the process for building a steel and concrete footbridge?

The process for building a steel and concrete footbridge typically involves several steps. First, the site is surveyed and prepared for construction. Then, the steel framework is fabricated and erected, followed by the pouring of concrete for the decking and walking surface. Finally, finishing touches such as handrails and lighting are added to complete the bridge.

What safety precautions are taken during the construction of a steel and concrete footbridge?

Safety is a top priority during the construction of a steel and concrete footbridge. Workers are required to wear personal protective equipment and follow strict safety protocols. The bridge itself is also designed to meet safety standards and undergoes rigorous testing to ensure its structural integrity.

What are the benefits of using steel and concrete for a footbridge?

There are several benefits to using steel and concrete for a footbridge. Both materials are strong and durable, making them ideal for supporting heavy loads and withstanding harsh weather conditions. Additionally, steel and concrete are relatively low maintenance and have a long lifespan, making them a cost-effective choice for footbridge construction.