Very Rough Feasibility of a prospective village sewage treatment plant

In summary: You could also contact a regional water authority to get their opinion on the feasibility of the project.
  • #1
tj00889
6
1
Hey Guys,
I would like to know from some of the more experienced engineers out there how you would go about ball-pointing the feasibility of a sewage treatment plant at the get go. In other words ,before anyone decides to spend any money on a thorough feasibility study. Namely ,I'm interested in bare minimum space requirements (rough cost) for say sewage treatment of a 10,000 population town for reuse in irrigation .I know there are many factors at play here but I'm speaking in very general terms .
Any input would be appreciated and stating some helpful resources would also be appreciated.
 
Engineering news on Phys.org
  • #2
The first thing you would have to do is estimate the amount of fluid that the town of 10,000 will produce.
And add to that how much precipitation there is for the location and how much of that enters the sewage system to go to the treatment plant instead of soaking up into the ground. You could use a holding facility for this precipitation since it is sporadic ( and the resident fluid ), or else let it overflow into the surrounding area, lake or river in times when it is excessive ( would that be one or more times per year you and your town will have to decide, along with the regulations required by higher levels of government ).

For the actual treatment, I suppose you will have to investigate how that is done and base the size of facility on volume of fluid that can be processed on a rate basis.
 
  • #3
Along with the information already provided you also need to consider tank size for the flocculant to bind to the waste. The flocculant lifts the waste material to be scraped off the surface as well as having scrapers below. Flocculants are specific to the chemicals used, and require specific PH control. So acids are also used, commonly sulpheric acid. Settling times on systems I've worked on are usually 1 hour. Then the water must be stored long enough to balance the BOD. (Bio oxygen demand). The settling time for the flocculant needs to be long enough for the flocculant otherwise your total suspended solid count will be high (TSS). Precise PH control is to say the least extremely tricky so the tank used for acid injection must have adequate stirring, even then precise control is near impossible. Part of your cost will need to include what to do with the waste derived via the flocculant, as human waste is poisonous to the environment. Waste from herbivores can be used for fertilizer, however you cannot do the same for carnivore or omnivore waste. (meat eaters).

Your best bet is to look for a chemical company that designs the flocculant for waste water facilities, and find out what their chemical cost is, settling time requirements, and PH requirements are. Different flocculants require different PH levels etc.

Also filters and membranes are used to remove the majority of the solids, so you also need to consider what to do with the solids such as plastic, metal, wood and cleaning chemicals that people tend to flush down sewage systems.

For resources I would talk to other sewage treatment plants already in use, as different Countries have different sewage treatment requirements on TSS and BOD levels etc
 
Last edited:

1. What is the purpose of a sewage treatment plant in a village?

A sewage treatment plant in a village is designed to treat wastewater from households and businesses before it is discharged into the environment. This helps to protect public health and the environment by removing harmful pollutants and pathogens from the wastewater.

2. What are the key elements of a village sewage treatment plant?

The key elements of a village sewage treatment plant typically include a collection system, a treatment process, and a discharge system. The collection system involves pipes and pumps that collect wastewater from homes and businesses and transport it to the treatment plant. The treatment process may involve physical, chemical, and biological processes to remove pollutants and pathogens from the wastewater. The discharge system then releases the treated wastewater into the environment, usually a nearby water body.

3. How do you determine the feasibility of a village sewage treatment plant?

The feasibility of a village sewage treatment plant can be determined by conducting a thorough analysis of various factors such as population size, available land, topography, soil type, and water sources. Other factors to consider include the cost of construction and operation, potential environmental impacts, and regulatory requirements. This analysis will help determine if a sewage treatment plant is a viable and sustainable solution for the village.

4. What are the potential benefits of a village sewage treatment plant?

A village sewage treatment plant can bring numerous benefits to the community, such as improved public health by reducing the spread of waterborne diseases, protection of the environment and local water sources, and increased property values. It can also create job opportunities and support economic growth in the village.

5. What are the potential challenges of building and operating a village sewage treatment plant?

Some potential challenges of building and operating a village sewage treatment plant include high construction and operational costs, limited availability of suitable land, and the need for skilled personnel to operate and maintain the plant. Additionally, community acceptance and support for the project may also be a challenge, as well as obtaining necessary permits and approvals from regulatory agencies.

Similar threads

  • STEM Academic Advising
Replies
8
Views
773
Replies
4
Views
4K
Replies
5
Views
15K
  • STEM Academic Advising
Replies
6
Views
3K
  • General Engineering
Replies
16
Views
6K
  • General Engineering
Replies
4
Views
9K
Replies
17
Views
3K
Replies
9
Views
8K
Replies
2
Views
2K
  • General Discussion
Replies
2
Views
3K
Back
Top