Calculating Work to Lift Kite String from Ground: A Puzzle

Click For Summary

Homework Help Overview

The problem involves calculating the work required to lift a kite string from the ground to a height of 500 ft, where the string follows a parabolic path. The string's weight is specified, and the setup includes both vertical and horizontal distances from the stringholder to the kite.

Discussion Character

  • Exploratory, Conceptual clarification, Mathematical reasoning, Assumption checking

Approaches and Questions Raised

  • Participants discuss the use of arc length and potential energy concepts, with some questioning the appropriateness of the parabolic model for the string's shape. Others explore the implications of calculating work based on the centroid of the curve.

Discussion Status

The discussion is ongoing, with participants offering hints and exploring different interpretations of the problem. There is a focus on the mathematical formulation needed to approach the work calculation, but no consensus has been reached on the best method yet.

Contextual Notes

Some participants note potential flaws in the problem's assumptions regarding the shape of the string and the method of integration, indicating a need for careful consideration of the variables involved.

sinas
Messages
15
Reaction score
0
Hi - Here's the entire problem to avoid confusion ><

"A kite is flying at a height of 500 ft and at a horizontal distance of 100 ft from the stringholder on the ground. The kite string weighs 1/16 oz/ft and is hanging in the shape of the parabola y=(x^2)/20 that joins the stringholder at (0,0) to the kite at (100,500). Calculate the work (in foot pounds) done in lifting the kite string from the ground to its present position."

I've been messing with arc length of the parabola because I think there might be a way to solve it with that, but I really don't know... Can someone give me a hint??
 
Physics news on Phys.org
I would like to point out first and foremost that that question is flawed because hanging strings follow hyperbolic not parabolic functions. The potential energy gained by moving the kite from the ground to its current position is equal to the work done to move it there. Consider how much work it takes to move an infinitely small portion of that kite string up a height h where h varies according to the parabolic function h = (x^2)/20. Sum these together and you have the basics of an integral. Be careful not to integrate with respect to x but with respect to the arc-length though, or express the arclength in terms of x.
 
Last edited by a moderator:
Ok I'm playing with that, but tell me something - if I were to calculate the work moving the entire string from 0 to the y-coordinate of the centroid of the curve, that wouldn't work, right? (no pun intended)
 
If I understand what you're trying to do right yes that would work. The centroid is the center of mass after all since the mass is distributed evenly along the string.
 

Similar threads

  • · Replies 1 ·
Replies
1
Views
3K
  • · Replies 10 ·
Replies
10
Views
14K
  • · Replies 16 ·
Replies
16
Views
18K
Replies
6
Views
4K
Replies
1
Views
4K
Replies
1
Views
6K
  • · Replies 17 ·
Replies
17
Views
8K
  • · Replies 3 ·
Replies
3
Views
3K
Replies
11
Views
3K
Replies
8
Views
3K