Replacing ATV Trail Bridges: Cat 259D Skid Steer Impact

In summary, the contractor replacing the other bridges was using this bridge to access the work site. The original supplier of the wood decking did not properly pressure treat the wood, so several of the bridges are being replaced.
  • #1
jrmichler
Mentor
2,239
2,992
A local ATV (All Terrain Vehicle) trail has some bridges over wetlands. The original supplier of the wood decking did not properly pressure treat the wood, so several of the bridges are being replaced. One bridge had the decking replaced last year. The contractor replacing the other bridges was using this bridge to access the work site.

P4270005.JPG

I don't know for a fact, but believe that ATV trail bridges have a design load of 5,000 lbs. This trail is closed to snowmobiles, so does not have trail groomers on it. The Caterpillar 259D tracked skid steer that made many trips over this bridge weighs 9,000 lbs plus the load.

In addition, when traveling from left to right, the skid steer goes up a steep ramp, then tips over the edge to flop down onto the level portion. That's an additional impact load.

The contractor is working on a contract with a firm finish date of soon. They had originally hoped to be done by last week, but still have one bridge to replace yet. I don't know if the contractor will be held liable for the damage to this bridge.
 
Engineering news on Phys.org
  • #2
Is there a question in there somewhere?
 
  • #3
phinds said:
Is there a question in there somewhere?
Probably good questions would be: Who signed off on this set of bridges? Who approved the EIR for this construction (related to the previous question)? Who would be liable if there had been injuries during this collapse? Yikes...
 
  • #4
phinds said:
Is there a question in there somewhere?

Just pointing out that, in the engineering world, there are the official requirements, and there are the real world requirements. And there are unexpected things that come up.

A similar example, but on a larger scale, is the highway system near Chicago, Illinois. The official requirement is that roads and bridges be designed for trucks weighing up to 80,000 lbs. The real world requirement is to deal with trucks, especially trucks carrying steel, weighing up to 120,000 lbs.

Note that the bridge is four feet above the ground. That was the result of a DNR requirement to make the bridge high enough so that vegetation could grow underneath. That did not work, so the replacement bridges are closer to the ground.

In Wisconsin, the laws concerning protection of wetlands are fully enforced. This bridge is in 230 square miles (about 150,000 acres) of County and National Forest in a county that is 38% wetland. Without this bridge, 0.02 acres of wetland would have been filled.
 
  • #5
jrmichler said:
The original supplier of the wood decking did not properly pressure treat the wood
Wetlands - pressure treated wood - wet lands - environment - not really all that good a combination.
https://www.doi.gov/sites/doi.gov/files/migrated/greening/buildings/upload/EnviromentalConsiderationsTreatedWood.pdf
 
  • #6
256bits said:
Wetlands - pressure treated wood - wet lands - environment - not really all that good a combination.
https://www.doi.gov/sites/doi.gov/files/migrated/greening/buildings/upload/EnviromentalConsiderationsTreatedWood.pdf
Yeah, but environomental impact is a completely separate issue from the issue of failure possibly due to improper/inadequate treatment, which is what this thread is about. I don't mean it's a bad point, just that it's not what this thread is about.
 
  • #7
jrmichler said:
I don't know if the contractor will be held liable for the damage to this bridge.
You won't know that without a report from a qualified/licensed engineer.

My humble opinion (based on a picture which only partially shows the structure) is that this construction seems to be dangerous/inadequate: the edges which are actually shouldering the load are just a few cm wide and with the flat elements bending under load this will just get smaller and smaller. Also the most important horizontal beam holding two (!) flat sections seems to have no fix against forward-backward (cross) movements, since it is standing on 'legs' in a single row - this further decreasing that safe 'shoulder' area when the construction is under load.
 
Last edited:
  • #8
phinds said:
Yeah, but environomental impact is a completely separate issue from the issue of failure possibly due to improper/inadequate treatment, which is what this thread is about. I don't mean it's a bad point, just that it's not what this thread is about.
Treated wood or untreated wood selection has an impact.
If treated or a wood less prone to rot is selected then the bridge and deck lifespan would be longer than that from an improper wood selection. Certain types of say oak with a dense grain or cellular structure absorb less moisture when in contact with the ground. Cedar for the deck might be selected for resistance to weathering effects and rot.
A lesser wood would require a beefier bridge design taking into account decreased performance over the years.

Even then,
If the other bridges that were being replaced were of the same design as timber, board and plank selection, then it would at first hand appear of not a robust enough of a design to withstand continued traffic over the expected lifespan at the connections from span to span. The decking seems to be adequate with what looks to be several 2 x 8 runners supporting it.

The ramp section looks as if it has moved backwards, thus removing the support for the span that has fallen down and broken in two. Movement in a wet marsh would be expected, so I am not sure if the free floating design of the span would have been safe over the years to come, as @Rive has pointed out.
 
  • #9
The spanwise beams did not slip off the cross beams. It broke into a V-shape, after which they chain sawed pieces out to get one half to fall down flat so they could get the skid steer out. The spanwise beams are (7) 3 X 10's of undetermined species on a 15 foot span. One of those spanwise beams broke at a weak spot, while the others looked solid.

Only the deck boards rotted. The posts, beams, and hardware were all solid.

The original design was supported by posts about 6 feet long. They were dug into the ground about 2 feet, with 4 feet exposed. Most of them had tilted about 30 degrees from vertical, which is why those bridges were replaced. The new posts are about 8 feet long, buried 6 feet into the ground, tied together with a cross beam at the bottom, and have cross bracing.
 
  • #10
I was by there on my morning run and talked to the skid steer operator that collapsed the bridge. He said that the drop was surprisingly gentle. No injuries, and no damage to the skid steer.
 

1. How does the Cat 259D Skid Steer impact the replacement of ATV trail bridges?

The Cat 259D Skid Steer is a versatile piece of equipment that is commonly used in construction and land management projects. Its compact size and powerful capabilities make it ideal for navigating rough terrain and carrying heavy loads, making it a valuable tool for replacing ATV trail bridges.

2. What are the benefits of using a Cat 259D Skid Steer for replacing ATV trail bridges?

Using a Cat 259D Skid Steer for replacing ATV trail bridges offers several benefits. Its compact size allows it to access narrow and hard-to-reach areas, and its powerful engine and hydraulic system make it capable of lifting and moving heavy bridge materials. This results in a more efficient and cost-effective bridge replacement process.

3. Are there any environmental concerns when using a Cat 259D Skid Steer for replacing ATV trail bridges?

As with any construction project, there may be potential environmental concerns when using heavy machinery like the Cat 259D Skid Steer. However, proper precautions and best practices can be implemented to minimize any negative impact on the environment. This may include using eco-friendly materials and ensuring proper disposal of any waste materials.

4. How long does it take to replace an ATV trail bridge using a Cat 259D Skid Steer?

The time it takes to replace an ATV trail bridge using a Cat 259D Skid Steer will vary depending on the size and complexity of the project. However, the use of this equipment can significantly speed up the process compared to using manual labor, potentially reducing the overall time and cost of the project.

5. Can the Cat 259D Skid Steer be used for other types of bridge replacement projects?

Yes, the Cat 259D Skid Steer can be used for various bridge replacement projects, including pedestrian bridges, small vehicle bridges, and even larger structures with proper attachments and modifications. Its versatility and capabilities make it a valuable asset in the construction industry for various projects.

Back
Top