    :surprised Ok.... here is a hard problem that I can not figure out!(These are all made up names!) :cry:

    When King Hagan commissioned Brightvale Castle to be built, he had every worker in Brightvale to help build it, so that it would be done as quickly as possible.

    The construction schedule went as follows: The foundations took exactly 1/6 of the total construction time. The walls took up the next 1/12 of the construction time. The roof was completed over the next 1/7 of the total construction time. Over the next five days, the windows and doors were placed in the castle. The workers spent half of the construction time building the floors after that was done. After that was done, the next four days were spent digging the moat.

    How many days total were spent building the castle? :confused:
     
  2. jcsd
  3. May 1, 2005 #2

    Pyrrhus

    User Avatar
    Homework Helper

    As i see it

    [tex] T = \frac{1}{6}T + \frac{1}{12}T +\frac{1}{7}T +5 + \frac{1}{2}T + 4 [/tex]

    where T is the construction time.
     
  4. May 3, 2005 #3
    Can someone help me with this really hard math puzzle???

    :confused: Ok.... here is a hard problem that I can not figure out!(These are all made up names!)

    When King Hagan commissioned Brightvale Castle to be built, he had every worker in Brightvale to help build it, so that it would be done as quickly as possible.

    The construction schedule went as follows: The foundations took exactly 1/6 of the total construction time. The walls took up the next 1/12 of the construction time. The roof was completed over the next 1/7 of the total construction time. Over the next five days, the windows and doors were placed in the castle. The workers spent half of the construction time building the floors after that was done. After that was done, the next four days were spent digging the moat.

    How many days total were spent building the castle? :surprised
     
  5. May 3, 2005 #4

    Pyrrhus

    User Avatar
    Homework Helper

    What's wrong? and please do not spam...
     
  6. May 3, 2005 #5
    The answer has been provided, there is no need to double post or double post a new thread.
     
  7. May 3, 2005 #6
    Sorry...it was by accident.. :frown:
     
  8. May 3, 2005 #7
    Sorry, nevermind.
     