In summary: Oops there goes 20% of your total stock!The second customer does the same.The third customer does the same.The fourth customer does the same.The fifth customer does the same.You make 25p and then have to spend 5p of it on overheads. You have just learned that you are breaking even.So lets try a new way of doing things. You find that you can fit 4 slices of bread in the toaster at any one time. You now decide to make 4 slices of toast in one go and sell them all individually. So...You make 4 slices of toast and sell them at 25p each. You make #1.You make another
  • #1
Andreii
53
0
Hi
For some calculations that I am doing before I begin with my diploma project I have to calculate, in our manufactory of bolts, the cost of bolt if I know just the bolt type (for example 3,0 x 15,75). I have tried to ask around to the offices who deal with economic subjects and they told me there is no way they could say this too anyone because its too private subject.
Is there any way to determinate this? I don't have any prizes of anything given (such as wire per one meter, worker's payment per one hour,...). I also asked, in the tooling section, for the tools that are required for bolts to be created but also they don't have any prizes of anything.

I know the prize of one bolt is negligible but I still do need to know how to get it, if is possible?

Thank you in advance,

kindest regards
 
Engineering news on Phys.org
  • #2
Bolts are typically made by computer-controlled machining tools, so the man labor costs would be very low. You could probably start by pricing the round metal rods that the bolts are made from. The main factor is going to be the price of the equipment and its associated running/maintenance costs. If you can figure out how much it costs to run the equipment for the amount of time it takes to make one bolt, then add your cost for material, you should be very close to the number you're looking for.
 
  • #3
It's meaningless to try to calculate the cost of 1 bolt as manufactured. As the more you make the cheaper per item you can make it. This is why is costs less to buy in bulk. Making 1 bolt will be chronically expensive.

What you want to ask is the production, tooling and manpower costs for a batch of bolts. Then divide price by number of bolts in a batch.

And bolts are ususally cold forged and turned, (they either use an autolathe sort of thing, or a cold rolling motion between threaded plates) I suspect the latter is more common for standard bolts.

EDIT: Further to this, I'd like to clarify that the reason it's meaningless for 1 bolt, is that bolts are not made 1 at a time. At any given time on the production run, there will be several bolts undergoing the same process at once. And multiple processes occurring simultaneously.
 
Last edited:
  • #4
As an academic exercise this type of analysis is far from meaningless. And yes, larger volumes would result in reduced material and machine-time costs per unit manufactured, but would not change the method of analysis whatsoever. Depending on how anal the OP's professor is he may also need to take into account the salaries of administrators, overhead costs for the facility, shipping and handling, etc. But since this is an engineering forum and not a business administration forum, I doubt any of that is necessary.
 
  • #5
Skrambles said:
As an academic exercise this type of analysis is far from meaningless. And yes, larger volumes would result in reduced material and machine-time costs per unit manufactured, but would not change the method of analysis whatsoever. Depending on how anal the OP's professor is he may also need to take into account the salaries of administrators, overhead costs for the facility, shipping and handling, etc. But since this is an engineering forum and not a business administration forum, I doubt any of that is necessary.

From a manufacturing perspective you cannot 'add' the costs up to make a bolt (edit: I suppose you could, but it'd be a bloody stupid way of doing it). As they simply aren't made like that. Saying that you need to find the machine time for 1 bolt is totally pointless. As the machine makes many many bolts at the same time. Yout start getting to silly extremes, such as each operation takes .25 seconds. There are 5 operations to make the bolt. So each bolt is made is 1.25 seconds. However of that 1.25 seconds the machine has made 5 bolts. The problem then is that bolts are heat treated, and you don't heat treat a single bolt at a time so you need the batch size.

Thats why I said the more sensible option is to get the overheads (fixed costs such as staffing and building) plus production costs (material and machine time) for a batch. Then divide the batch cost by the number of bolts. et voila cost to make a single bolt.

EDIT: This also requires you to talk someone into giving you real figures if you want to be remotely accurate. You could just estimate them.
 
Last edited:
  • #6
I agree with you Chris, but I doubt he needs to get into all of the minute details of the manufacturing process for this assignment. He probably just needs to show that he understands the method and can come up with some general formula for estimating the unit cost.
 
  • #7
Yer, it's just you tend to work things that are mass produced in batches backwards to get a unit cost, unlike a machined part which it's easy to work out in a conventional manner.

I kind of wanted you be argue with it, so I can use my making toast analogy for individual vs batch parts. :P
 
  • #8
Ok, I'll play devils advocate. But only if you can work in tolerances, random sampling, AND you butter both sides of the bread before you toast it.
 
  • #9
Win. The analogy goes a little bit like this. I'll just carry on as I am sure that everyone will get the point before I get to the end anyway.

I have a 4 slot toaster and an unlimited amount off free bread you can use to make scrummy toast to sell for a profit. I will give you the bread for free, but charge you #1 evert time the toaster is used.

If you use the 'add up' method to determine unit cost. We get 25p per slice of toast. So to make a profit we add 5p as a cost plus sort of thing.

The first customer comes along and orders 5 slices of toast. We do it and sell for #1.50, but make a 50p loss. As we have used the toaster twice.

The problem is the toaster works in batches of 4, so any incomplete batch costs you money. The method of costing a single item then * by the amount of items can lead to losses. (This can and does happen in industry) So in the bolt case we really should calculate unit cost backwards from bach cost.

If this were a single rack toaster (like the machined part) then the single cost * amount of units = total cost.
 
Last edited:
  • #10
Chris all bolts aren't heat / thermal treated. This depends what customer wants. Same is for making a screws on the bolts - it all depends on customer's wishes.

Bolt prize about which I was asking and I am still, should be different for every single type of bolt. My purpose of calculating the prize of just one, which is almost negligible, is because of making some quality assurance project for my diploma project.
Lets say we have two boxes with bad (from defects point of view) bolts: in first one are 600 bolts, in second one are 1100 bolts. You cannot say, for sure, that more damage (from econic point of view) was made in the second one just because the number is higher. One of parameters is a mass of one single bolt which is very easy to get. But I need the prize. They have it in the offices but nobody knows it and there is no way I would get the prize for every single bolt type I would want to know. I will already have to bother them for a name of wire's supplier. Cannot bother even more for a prize. So somehow I must determinate this alone.

So chris when you mentoined production, tooling and manpower costs. I cannot get them. Need to do my own research / calculation. People in offices who communicate with (potentional) customers, deal with orders etc won't give me any costs. Costs may be changing depends on which customer ask for whatever order. I need the fixed (at least as close as possible) prize for specific bolt type.
 
  • #11
Andreii said:
Chris all bolts aren't heat / thermal treated. This depends what customer wants. Same is for making a screws on the bolts - it all depends on customer's wishes.

Bolt prize about which I was asking and I am still, should be different for every single type of bolt. My purpose of calculating the prize of just one, which is almost negligible, is because of making some quality assurance project for my diploma project.

Lets say we have two boxes with bad (from defects point of view) bolts: in first one are 600 bolts, in second one are 1100 bolts. You cannot say, for sure, that more damage (from econic point of view) was made in the second one just because the number is higher. One of parameters is a mass of one single bolt which is very easy to get. But I need the prize. They have it in the offices but nobody knows it and there is no way I would get the prize for every single bolt type I would want to know. I will already have to bother them for a name of wire's supplier. Cannot bother even more for a prize. So somehow I must determinate this alone.

So chris when you mentoined production, tooling and manpower costs. I cannot get them. Need to do my own research / calculation. People in offices who communicate with (potentional) customers, deal with orders etc won't give me any costs. Costs may be changing depends on which customer ask for whatever order. I need the fixed (at least as close as possible) prize for specific bolt type.

Well we've told you how to do it, we can't acutally tell you how to acquire the data. All I was saying is that trying to work out a machine time and cost to make 1 bolt on something that is batched produced is likely to give an erroneous unit cost. You work out the cost of a batch, then fint a unit cost from that.

Absolutely no company will give you acutal data on the specific methods and times to make bolts. As that's a security thing, it would be silly for them to give away confidental information. I'm afraid I can't help there.

Also, I realize there is a language barrier here (priobably), but there word you are looking for is price not prize. (sorry I am not ususally the spelling police)
 
  • #12
Wow... you're kidding right? This is what happens when you put super-academic engineers on the job. Spend a few years in the field designing products to compete with competitors and you'll know EXACTLY how to do this.

  1. Find that bolt at a hardware store
  2. Estimate markup based on shipping, packaging, and marketing
  3. ?
  4. Profit

The exercise demonstrates critical thinking and forces you to recognize that there are two ways to find a common answer. From the bottom up, or from the top down.
 
  • #13
FlexGunship said:
Wow... you're kidding right? This is what happens when you put super-academic engineers on the job. Spend a few years in the field designing products to compete with competitors and you'll know EXACTLY how to do this.

  1. Find that bolt at a hardware store
  2. Estimate markup based on shipping, packaging, and marketing
  3. ?
  4. Profit

The exercise demonstrates critical thinking and forces you to recognize that there are two ways to find a common answer. From the bottom up, or from the top down.

That's how anyone would do it in reality. However if you notice, this is for an academic report looking at QA issues. Hence an academic approach. I don't think the end point is to acutally find how much a bolt cost, but to use that information in some way. So for example estimating machine time cost for a scrapped batch, you'd ten have to 'estimate' and break down the final cost into 'sub costs'.

Just like many things are designed by skeg of eye, yet you can't stick that in an academic report. "I made it thicker becuase it just looked too thin".
 
  • #14
xxChrisxx said:
That's how anyone would do it in reality. However if you notice, this is for an academic report looking at QA issues. Hence an academic approach. I don't think the end point is to acutally find how much a bolt cost, but to use that information in some way.

Just like many things are designed by skeg of eye, yet you can't stick that in an academic report. "I made it thicker becuase it just looked too thin".

I appreciate your attitude. But pragmatism often wins the day. I gave this problem to some students in a different form. Essentially the challenge was: "given a SolidWorks drawing of an egg carton, estimate the volume of eggs it can hold using any valid means."

I gave them a drawing of a 12 egg carton. After some of them handed in 14 pages of calculations and estimates. I dropped 12 eggs into a full container of water and measured the displacement.

Sometimes academia will test your ability to use reason, logic, and intuitive problem solving. Not everything is about "finding the right formula."
 
  • #15
FlexGunship said:
I appreciate your attitude. But pragmatism often wins the day. I gave this problem to some students in a different form. Essentially the challenge was: "given a SolidWorks drawing of an egg carton, estimate the volume of eggs it can hold using any valid means."

I gave them a drawing of a 12 egg carton. After some of them handed in 14 pages of calculations and estimates. I dropped 12 eggs into a full container of water and measured the displacement.

Sometimes academia will test your ability to use reason, logic, and intuitive problem solving. Not everything is about "finding the right formula."

Fact is, both you and I don't have a clue what the guy is trying to achieve. We've given him 3 different ways to calcualte the cost of a bolt, depending on what he's goign to do with the information will determine the method used.

To behonest, any way he does this will involve fudging numbers as no one is going to give him real figures for confidentiality reasons. So whether he pulles figures for markup out of his arse or whether he makes up figures for production costs, it's all likely to be wrong anyway.
 
  • #16
xxChrisxx said:
To behonest, any way he does this will involve fudging numbers as no one is going to give him real figures for confidentiality reasons. So whether he pulles figures for markup out of his arse or whether he makes up figures for production costs, it's all likely to be wrong anyway.

Yeah, I agree with this.
 
  • #17
both you and I don't have a clue what the guy is trying to achieve.

I need it for Pareto diagrams for the boxes with bad (dimensional defects and defects that cannot be measured) bolts regarding two different topics:

1. To suggest which worker(s), IF any, should be fired from the company because of too high unnecessary expenses done. This is responsible work and I need to be very careful that I don't do iniquity to anyone. Everything must be stated with correct and good proofes. Steps are the following: first I measure the weight of the box with ''bad'' bolts, then I decrease the number for the mass of the box (for chosen machine) and I get the mass of what's inside (in this case, I ignore the mass of uncleanliness but I still care for it and remove anything bigger). Then I go to more precise measuring tool to get the mass of one single bolt. Next is to divide 1 kg with the mass of one single bolt so I get the number of bolts in 1 kg. Next step is to multiply number of bolts in 1 kg with the mass of what's inside the box. So I get number of bolts (they must be same type) in the box.
Unfortunately for me, this is not the end. With the last step, to get the damage in whichever money currency unit, I am stucked. I should multiply number of bolts in the box with the price of one single bolt but I don't know the price and that's why I am asking. :-(

If you have any better idea then I would please you for it. So far this is the best solution I can think of how to deal with issue that ''higher number of bolts doesn't necessary mean more unneccessary expenses done''.

2. Similar, also in Pareto analyze tool, I need to take the datas for all three parameters for wires: supplier, material and diameter. I still need to try to think which costs should be included here: costs of wire per XY mass or cost of one bolt.

Its a part of diploma project for university.
We've given him 3 different ways to calcualte the cost of a bolt

Thank you but this is not really what I search for. Those 3 ways require costs of machine running, material etc. As I mentoined; I don't have any costs to work with. So my question remains the same. Probably no one from our company will be willing to give me them - you stated the reasons why already and I do agree with them.
 
  • #18
Andreii said:
I need it for Pareto diagrams for the boxes with bad (dimensional defects and defects that cannot be measured) bolts regarding two different topics:

1. To suggest which worker(s), IF any, should be fired from the company because of too high unnecessary expenses done. This is responsible work and I need to be very careful that I don't do iniquity to anyone. Everything must be stated with correct and good proofes. Steps are the following: first I measure the weight of the box with ''bad'' bolts, then I decrease the number for the mass of the box (for chosen machine) and I get the mass of what's inside (in this case, I ignore the mass of uncleanliness but I still care for it and remove anything bigger). Then I go to more precise measuring tool to get the mass of one single bolt. Next is to divide 1 kg with the mass of one single bolt so I get the number of bolts in 1 kg. Next step is to multiply number of bolts in 1 kg with the mass of what's inside the box. So I get number of bolts (they must be same type) in the box.
Unfortunately for me, this is not the end. With the last step, to get the damage in whichever money currency unit, I am stucked. I should multiply number of bolts in the box with the price of one single bolt but I don't know the price and that's why I am asking. :-(

If you have any better idea then I would please you for it. So far this is the best solution I can think of how to deal with issue that ''higher number of bolts doesn't necessary mean more unneccessary expenses done''.

2. Similar, also in Pareto analyze tool, I need to take the datas for all three parameters for wires: supplier, material and diameter. I still need to try to think which costs should be included here: costs of wire per XY mass or cost of one bolt.

Its a part of diploma project for university.


Thank you but this is not really what I search for. Those 3 ways require costs of machine running, material etc. As I mentoined; I don't have any costs to work with. So my question remains the same. Probably no one from our company will be willing to give me them - you stated the reasons why already and I do agree with them.

Well it's a bit of a tricky one then. As to calcualte a cost for something you need the cost of the processes to work forward or the sale cost and then their markup. There really is no way to calcualte the cost of a bolt with no data.

I think I see what you are trying to achieve with knowing the price now. Unfortunately I have little experience with QA stuff, so I can be of little help there, sorry.
 
  • #19
The BEST you could possible do is come up with a formula. But given that the formula would be of arbitrary precision (you don't even know the magnitudes of the numbers involved unless you make some serious assumptions), you might as well not bother making it particularly precise.

bolt_cost = material_cost + manufacturing_cost + acquisition_cost

purchase_price = bolt_cost + transportation_cost + markup

There.

Want more detail? Start filling in the blanks. What is material cost based on? What is the manufacturing cost based on? What is the acquisition cost based on? I mean, seriously... you need to go to a hardware store and start filling in blanks.

A hardware store receipt will tell you purchase_price. Ask the owner how much he marks it up. Find a shipping quote based on the weight of one bolt and average shipping distance.

Now you have the cost of a bolt without knowing the material_cost or the manufacturing_cost or the acquisition_cost. And that is EXACTLY what you are asking for.

If this approach isn't acceptable, I sincerely recommend you give up. Cause the constraints you are applying to this problem make it unsolvable. "Determine the cost of something without knowing anything."
 
  • #20
To figure out which worker is least efficient why can't you just calculate their scrap rate?

Scrap Rate = Mass of Defective Bolts / Total Mass of Defective and Acceptable Bolts

For the Pareto analysis...that's a lot more complicated. The material supplier may not set their prices by weight. A two foot long piece may not be twice as expensive as a one foot long piece. The material and diameter will also affect which tools can be used and at what speed they can be run.
 
  • #21
Skrambles said:
To figure out which worker is least efficient why can't you just calculate their scrap rate?

Scrap Rate = Mass of Defective Bolts / Total Mass of Defective and Acceptable Bolts

Bolts are mass produced parts. There is no worker that can bugger a bolt up as it's all automated. Bolt failures are mostly material defects, which is why when say 5 bolts in a batch fail, the whole batch is chucked.

If you wanted to know who to fire, resourcing planning and fire the one who has the most idle time.
 
Last edited:
  • #22
Skrambles said:
To figure out which worker is least efficient why can't you just calculate their scrap rate?

Scrap Rate = Mass of Defective Bolts / Total Mass of Defective and Acceptable Bolts
Because the boxes with ''good'' bolts (from quality point of view) are welded to the ground and connected with the tape where bolts are moving. There is no way to move this box to the measuring weight tool. Only boxes with ''bad'' bolts can be moved / transported.

FlexGunship thank you for reply. I don't need the purchase_price because for statistical process control of throw out (scrap) is bolt_cost enough. There is no hardware store where I could see those three datas. What kind of acquisition you meant? When bolts without screws are created, there are several other processes to do - based on what customer ask for. Always is cleaning process done. But thermal / surface treatment depends on the order of customer. I have no idea about manufactoring cost how to get and what is included. Could be hard to get that. I cannot judge acquisition costs because I don't know what you meant with that and that's why I asked in this reply. Probably the most easy solution would be for material cost. Which material? Wire? Perhaps google could say something.
 

What factors determine the cost of a single bolt?

The cost of a single bolt is determined by several factors, including the material it is made of, its size and shape, the manufacturing process, and the quantity purchased.

Why do the costs of bolts vary?

The cost of bolts can vary due to differences in materials and production methods. Additionally, the cost may also be affected by market demand and competition among suppliers.

How can I calculate the cost of one single bolt?

The cost of a single bolt can be calculated by dividing the total cost of a package or order by the number of bolts included. For example, if a package of 100 bolts costs $10, the cost of one bolt would be $0.10.

What is the average cost of a single bolt?

The average cost of a single bolt can vary depending on the factors mentioned above. However, on average, a single bolt can cost anywhere from a few cents to a few dollars.

What are some common materials used to make bolts?

Bolts can be made from a variety of materials, including steel, stainless steel, aluminum, and titanium. The material used can impact the cost of a single bolt.

Similar threads

Replies
1
Views
921
  • Mechanical Engineering
Replies
6
Views
6K
  • Mechanical Engineering
Replies
9
Views
4K
  • Introductory Physics Homework Help
Replies
2
Views
716
Replies
11
Views
8K
  • Mechanical Engineering
Replies
12
Views
13K
  • Mechanical Engineering
Replies
6
Views
3K
Replies
6
Views
4K
  • DIY Projects
Replies
32
Views
6K
Replies
1
Views
2K
Back
Top