Dear Fellows,
Well, i am working on a power plant and i need to analyse the Cooling Water Piping Circuit (Supply/Return piping), i.e., from Turbine Surface Condenser to Cooling Towers and from Cooling Water Pumps to Turbine Surface Condenser. The Lines are huge around 52" NPS and are buried under ground and gets aboveground just before connecting to the equipment. What design considerations should i have in mind ? Any need of anchor blocks ?
Will be very grateful if you recommend me some literature.
Thanks.
Well, i am working on a power plant and i need to analyse the Cooling Water Piping Circuit (Supply/Return piping), i.e., from Turbine Surface Condenser to Cooling Towers and from Cooling Water Pumps to Turbine Surface Condenser. The Lines are huge around 52" NPS and are buried under ground and gets aboveground just before connecting to the equipment. What design considerations should i have in mind ? Any need of anchor blocks ?
Will be very grateful if you recommend me some literature.