My engineer is out of contact and I need to verify what my contractor is telling me.
ANY HELP WOULD BE GREAT AS THIS IS HOLDING UP A MAJOR JOB.
I have a hopper 8” x 4” (l x w) that is supported by 2” square tubing (3/8” thick).
The structure looks like an oil derek and is 12’ high with...