Recent content by andyskin
-
Engineering Therefore, R's=0.057/26.5^2=0.000078 Ω2% of 415 V is 8.3 V
Primary winding voltage v1 = 415V Secondary winding voltage v2 = 11kv Rating of transformer is 200KVA winding resistance Rieq = 0.14 Ω winding leaking reactance Xieq = 0.057 Ω A) % regulation at 0.8 power factor lagging Primary winding current I1 = 200/415 = 482a Power factor CosΦ =...- andyskin
- Thread
- Transformer
- Replies: 1
- Forum: Engineering and Comp Sci Homework Help
-
What Capacitance is Needed for a 50 kW Load with a 60% Lagging Power Factor?
thank you for your help, i'll have a look- andyskin
- Post #7
- Forum: Engineering and Comp Sci Homework Help
-
What Capacitance is Needed for a 50 kW Load with a 60% Lagging Power Factor?
the full question meant to read: A 50 kW load operates from a 60 Hz 10 kV rms line with a power factor of 60% lagging. Determine the capacitance that must be placed in parallel with the load to achieve a 90% lagging power factor.- andyskin
- Post #5
- Forum: Engineering and Comp Sci Homework Help
-
What Capacitance is Needed for a 50 kW Load with a 60% Lagging Power Factor?
Sorry didn’t know there was a homework section- andyskin
- Post #3
- Forum: Engineering and Comp Sci Homework Help
-
What are the joys and challenges of being a pet owner?
Thank you, he's a little pain but i wouldn't swap him for anything- andyskin
- Post #3
- Forum: New Member Introductions
-
What Capacitance is Needed for a 50 kW Load with a 60% Lagging Power Factor?
Please can you have a look at the file at point me in the right direction if I'm wrong. Thank you- andyskin
- Thread
- Capacitance Line Load Parallel Power Power factor Rms
- Replies: 6
- Forum: Engineering and Comp Sci Homework Help
-
What are the joys and challenges of being a pet owner?
My name is Andrew I'm from Newark uk- andyskin
- Thread
- Replies: 2
- Forum: New Member Introductions