Hi all,
I'm doing a stress analysis and I’m considering 3 buried pipelines carrying oil.
Vibrating wire strain gauges have been installed in different sections for a total of 468 strain gauges.
These have been arranged on the surface of the pipelines 120°apart:
This pipelines have...