Concrete bridge pier formwork design
Thanks for the reply. We've been given a value of 2600 kg/m^3 for the concrete density. From my calcs the concrete will be limited by setting so it won't reach the full hydrostatic pressure. So the spacing of the fasteners will get closer as we get closer to the ground and then be evenly...- Joey Jo Jo Jr
- Post #3
- Forum: Engineering and Comp Sci Homework Help
-
J
Concrete bridge pier formwork design
Homework Statement I have to design the formwork system for an octagonal bridge pier similar to the type shown below, plus a headstock. http://img577.imageshack.us/img577/5743/prexconcretebridgecolum.jpg Homework Equations The Attempt at a Solution I can use any system I...- Joey Jo Jo Jr
- Thread
- Bridge Concrete Design
- Replies: 4