Recent content by Leinad7

  1. L

    Calc III Optimization problem (for dumpsters)

    Ah yes. You'd have to add those up. So in addition to the already existing cost function add the welding. Now do I take partials and find criticals?
  2. L

    Calc III Optimization problem (for dumpsters)

    Sorry for not adding my work. Here it is so far: V = b*w*h. Solving for h, h=v*(y*x)^-1 For my cost function c=.9*x*y+.7*2*x*v*(y*x)^-1+.7*2*y*v*(y*x)^-1+50 Simplifyed a bit more here, c=.9*x*y+1.4v*y^-1+1.4v*x^-1+50 There's a problem with this, I have no included the welding costs...
  3. L

    Calc III Optimization problem (for dumpsters)

    Homework Statement "For this project we locate a trash dumpster in order to study its shape and constuction. We then attempt to determine the dimensions of a container of similar design that minimize construction cost." 1. (Already located, measured, and descibed a dumpster found). 2...
Back
Top