Recent content by rylest
-
Bending moment and buckling in 100ft horizontal schedule 40 pipe system
Of course! Seems like the 100ft line has some clamps on it higher up but at least for the initial 30ft there is no other structure. It seems to be fine? The two L1 pipes already exist I'm looking at adding the L2 pipe and tieing in.- rylest
- Post #3
- Forum: Mechanical Engineering
-
Bending moment and buckling in 100ft horizontal schedule 40 pipe system
Some more details on the system are that L1 is very long (close to 100ft) and L2 is close to 30ft (the vertical pipes). The piping is all schedule 40 1/2" OD. Moment of inertia is roughly 10^-8. Components are about 2kg each. The distance of the pipes horizontally is small (around 2ft). Pressure...- rylest
- Thread
- Bending Bending moment Complex hand Moment Pipe Stuck System
- Replies: 2
- Forum: Mechanical Engineering