Register to reply

Westinghouse 3-loop PWRs

by rmattila
Tags: 3loop, pwrs, westinghouse
Share this thread:
rmattila
#1
Aug23-11, 03:31 PM
P: 242
Would anybody happen to have at hand the water volume of the secondary side of Westinghouse 3 loop PWR steam generators?

Regarding the loss of external grid incident at North Anna, it would be nice to have a rough estimate of how long the plants could survive a total blackout by boiling off water from the SG:s.
Phys.Org News Partner Science news on Phys.org
Wildfires and other burns play bigger role in climate change, professor finds
SR Labs research to expose BadUSB next week in Vegas
New study advances 'DNA revolution,' tells butterflies' evolutionary history
Astronuc
#2
Aug23-11, 03:44 PM
Admin
Astronuc's Avatar
P: 21,827
Quote Quote by rmattila View Post
Would anybody happen to have at hand the water volume of the secondary side of Westinghouse 3 loop PWR steam generators?

Regarding the loss of external grid incident at North Anna, it would be nice to have a rough estimate of how long the plants could survive a total blackout by boiling off water from the SG:s.
Earthquake was about 8-9 miles from the plant, although some info indicates 1 mile. They lost off-site power and the EDGs started up. Both units shutdown.

I'm sure they'll have an interesting Event Report out soon.
QuantumPion
#3
Aug23-11, 03:55 PM
P: 772
Quote Quote by rmattila View Post
Would anybody happen to have at hand the water volume of the secondary side of Westinghouse 3 loop PWR steam generators?

Regarding the loss of external grid incident at North Anna, it would be nice to have a rough estimate of how long the plants could survive a total blackout by boiling off water from the SG:s.
With a loss of feedwater flow, PWR steam generators boil dry in minutes.

North Anna has a terry turbine (steam-powered pump) to provide feedwater flow in the case of loss of total electrical power failure, as well as a station blackout diesel (in addition to the regular backup diesels).

rmattila
#4
Aug24-11, 12:06 AM
P: 242
Westinghouse 3-loop PWRs

If the steam generators are similar to Ringhals 4, which is a 935 MWe Westinghouse 3-loop PWR, their secondary side inventory would appear to be some 40 m3 or 30 t per SG, which would 1 hour after scram be enough for approximately 1.5 h, if I got the figures correct.

However, the existence of a steam driven auxiliary pump and an SBO diesel make the situation appear quite non-problematic.


Register to reply

Related Discussions
Westinghouse intern Career Guidance 12
Safety margins in PWRs Nuclear Engineering 2
Edison vs westinghouse Introductory Physics Homework 3
Any other High School Seniors participating in this years Siemen's Westinghouse Comp? Academic Guidance 5
Fresh student of nuclear engineering Nuclear Engineering 2