Would anybody happen to have at hand the water volume of the secondary side of Westinghouse 3 loop PWR steam generators?

Regarding the loss of external grid incident at North Anna, it would be nice to have a rough estimate of how long the plants could survive a total blackout by boiling off water from the SG:s.
Phys.Org News Partner Science news on Phys.org
FIXD tells car drivers via smartphone what is wrong
Team pioneers strategy for creating new materials
Team defines new biodiversity metric
Astronuc
#2
Aug23-11, 03:44 PM
Admin
Astronuc's Avatar
P: 21,871
Quote Quote by rmattila View Post
Would anybody happen to have at hand the water volume of the secondary side of Westinghouse 3 loop PWR steam generators?

Regarding the loss of external grid incident at North Anna, it would be nice to have a rough estimate of how long the plants could survive a total blackout by boiling off water from the SG:s.
Earthquake was about 8-9 miles from the plant, although some info indicates 1 mile. They lost off-site power and the EDGs started up. Both units shutdown.

I'm sure they'll have an interesting Event Report out soon.
QuantumPion
#3
Aug23-11, 03:55 PM
P: 778
Quote Quote by rmattila View Post
Would anybody happen to have at hand the water volume of the secondary side of Westinghouse 3 loop PWR steam generators?

Regarding the loss of external grid incident at North Anna, it would be nice to have a rough estimate of how long the plants could survive a total blackout by boiling off water from the SG:s.
With a loss of feedwater flow, PWR steam generators boil dry in minutes.

North Anna has a terry turbine (steam-powered pump) to provide feedwater flow in the case of loss of total electrical power failure, as well as a station blackout diesel (in addition to the regular backup diesels).

rmattila
#4
Aug24-11, 12:06 AM
P: 242
Westinghouse 3-loop PWRs

If the steam generators are similar to Ringhals 4, which is a 935 MWe Westinghouse 3-loop PWR, their secondary side inventory would appear to be some 40 m3 or 30 t per SG, which would 1 hour after scram be enough for approximately 1.5 h, if I got the figures correct.

However, the existence of a steam driven auxiliary pump and an SBO diesel make the situation appear quite non-problematic.


Register to reply

Related Discussions
Westinghouse intern Career Guidance 12
Safety margins in PWRs Nuclear Engineering 2
Edison vs westinghouse Introductory Physics Homework 3
Any other High School Seniors participating in this years Siemen's Westinghouse Comp? Academic Guidance 5
Fresh student of nuclear engineering Nuclear Engineering 2