Please redirect if this post is not in the right place.
I want to install a jib crane in my shop. Vertical upright is planned to be a 5" H-beam in concrete, with 12' above ground, 4' into rock below grade level. Horizontal beam will be same, 10' long. (See attached figure)
Am trying...