Recent content by kirilrost
-
K
Inventory of Cs-137 in Reactor Shutdown on 1/1/2009
Problem: Reactor operating at 2300 MW with specific power of 24.42 MW/MT, was shutdown on 1 January 2009. The reactor was fueled with 93.3 MT of uranium with initial enrichment of 3.8% U-235. At shutdown, core burnup 23.3 GW-day/MT. Question: 1.What was inventory of Cs-137 when the reactor...- kirilrost
- Thread
- Replies: 3
- Forum: Nuclear Engineering