Recent content by turi

  1. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Mainichi reports that reactor fuel removal work should start at unit 2 as it seems to be the easiest target: https://mainichi.jp/english/articles/20190809/p2a/00m/0na/005000c Demolition work on the exhaust stack between units 1 and 2 has started...
  2. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    SFP3 progress page: https://www7.tepco.co.jp/responsibility/decommissioning/action/spent_fuel/unit3-e.html
  3. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    A new video by Tepco; the year in review: https://www4.tepco.co.jp/en/news/library/archive-e.html?video_uuid=xh57k85s&catid=61795
  4. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Mainichi reports that TEPCO is set to extract a debris sample from unit 2: http://mainichi.jp/english/articles/20180316/p2a/00m/0na/018000c For your search optimization: The Fukushima units are often written like "2号" for example for unit 2 in Japanese. Depending on the site I've been on or the...
  5. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Unit 1 sample results are in: http://www.tepco.co.jp/nu/fukushima-np/handouts/2017/images2/handouts_171030_07-j.pdf Didn't have time to have a closer look at them yet.
  6. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Me neither. Not even in the separately linked files for water injection change days for unit 1 (e.g. http://www.tepco.co.jp/en/nu/fukushima-np/f1/pla/2017/images/20170125_pcvtemp1u-e.pdf). I don't see any special pattern.
  7. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    The thermometers currently used are: http://www.tepco.co.jp/en/nu/fukushima-np/f1/pla/2017/images/figure-e.pdf referenced here http://www.tepco.co.jp/en/nu/fukushima-np/f1/pla/index-e.html Historical values (twice a day) can be found here...
  8. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    There's a whole bunch of new press releases from Tepco. I won't find time to read them in detail at the moment. Interesting documents: http://www.tepco.co.jp/nu/fukushima-np/handouts/2017/images2/handouts_170830_02-j.pdfAbout water in the reactor buildings...
  9. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    This morning Tepco had the last valve for the frozen wall opened. Let's see whether closing those last 7 m (of 860 m) makes a difference. http://www.tepco.co.jp/nu/fukushima-np/handouts/2017/images2/handouts_170822_02-j.pdf
  10. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Tepco will run a "temperature stabilization test" in the SFP of unit 2. The expectation is that for all three SFPs natural cooling is now sufficient even with high summer temperatures. This has already been shown for the SFP of unit 1...
  11. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Groundwater influx into the reactor and turbine buildings has been significantly reduced: http://www.tepco.co.jp/en/nu/fukushima-np/handouts/2017/images/handouts_170807_01-e.pdf
  12. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Flow rates are published at least daily: http://www.tepco.co.jp/nu/fukushima-np/handouts/2017/images2/handouts_170809_07-j.pdf Water is injected via core spray and the regular cooling pathway (forgot its name). But I'm not sure if it's really possible to calculate much with the data available.
  13. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    I couldn't find temperature data on the injected vs. the returned water. But http://www.tepco.co.jp/nu/fukushima-np/f1/pla/index-j.html has a lot of current temperature measurements for RPVs and PCVs.
  14. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    Irid reports on full scale tests of leakage stopping technology. Due to the additional weight when filling whole parts of the suppression chamber the support columns would have to be reinforced as well...
  15. T

    Fukushima Japan Earthquake: nuclear plants Fukushima part 2

    The first of 8 dome parts has been installed on unit 3 as part of the preparations for the fuel removal from the spent fuel pool.
Back
Top