I have about 300 metric tons Iron Filings as per attached representative photo in a godown. Mixed with small percentage of Aluminum.
I need to separate the Iron filings and Aluminum.
Separated Iron Filings need to be straightaway loaded onto a truck.
Godown entrance is about 4...