New Nuclear Plants
Where can i find more information about new nuclear plant start-up procedures?
|
| Aug20-10, 01:59 AM | #2 |
|
|
Hi there,
What do you mean by "start-up procedures"??? Are you looking for the commission tests that are made on new plants??? Where are you from, since this will influence the answer whether you are in the US, in Europe, or somewhere else. Cheers |
| Aug20-10, 06:41 AM | #3 |
|
Admin
|
|
| Aug21-10, 12:14 AM | #4 |
|
|
New Nuclear Plants
By start-up I mean for example, when they start the reactor for the very first time, they start the reactor with 10% percent of the full power. Then they run the reactor for couples of month before going straight up to the full power. I'd like to find information about why they don't just start the reactor with its full power? How long does it take to go to full power? Why is it necessary to take those steps? In terms of reactors I prefer to know about PWR types of reactor such as AP-1000, the new EPR or Candu?
|
| Aug21-10, 06:50 AM | #5 |
|
Admin
|
In the initial heat up, the reactor system is given time to heat up for cold zero power (CZP) to hot zero power (HZP) and at the same time the system is pressurized. This is actually accomplished by running the pumps, and it gives the system time to adjust, and the plant staff test various systems. With the first time, many components are checked to verify that they are performing as expected, and instrumentation calibration is checked. At temperature, they would control rod drop (scram) tests.
Criticality is achieved after withdrawing various banks of control rods, and rod worth is tested. In-core and ex-core detectors are checked. Normally with an operating plant, the turbine will start rolling at about 15% power - give or take, and the secondar side of a PWR is given a chance to heat up. Once systems are stabilized, power ascension continues. At about 30% power, chemistry checks are performed and flux maps are taken. There is usually another hold at 50%, the about 75%, and may be a few more to look at the axial power distribution, chemistry and thermocouple readings. Startup is also the time that operators and other plant personnel are introduced to the plant operation, although they will have had training on a simulator. Ships are tested on a shake down cruise to test the systems and introduce the crew to operation, and I believe prototype aircraft are similarly tested. FYI - http://www.nrc.gov/reading-rm/doc-co...r-reactors/rg/ Specifically - Reg Guide 1.68 - Initial Test Programs for Water-Cooled Nuclear Power Plants http://www.nrc.gov/reading-rm/doc-co...068/01-068.pdf |
| Aug21-10, 05:10 PM | #6 |
|
|
|
| Aug21-10, 05:28 PM | #7 |
|
Blog Entries: 2
|
Reactor Recirculation Pumps impart energy into the reactor coolant that eventually turns into heat.
|
| Aug21-10, 05:38 PM | #8 |
|
|
|
| Aug21-10, 05:41 PM | #9 |
|
Admin
|
FYI - http://www.ansn-jp.org/jneslibrary/npp1.pdf |
| Aug21-10, 05:46 PM | #10 |
|
Admin
|
Pre-operational tests are performed in two phases: • Phase I: preliminary tests • Phase II: plant functional tests (before fuel loading) PLANT COMMISSIONING PROGRAMME |
| Thread Closed |
| Thread Tools | |
Similar Threads for: New Nuclear Plants
|
||||
| Thread | Forum | Replies | ||
| Gen IV Nuclear Plants | Nuclear Engineering | 10 | ||
| Portable nuclear plants | Nuclear Engineering | 31 | ||
| New Nuclear Plants | Nuclear Engineering | 14 | ||
| The Sun and Nuclear Power Plants | Biology, Chemistry & Other Homework | 3 | ||
| Nuclear Power Plants | Nuclear Engineering | 3 | ||