Recent content by RJCanz

  1. RJCanz

    Calculating Capacity of Steel Rack: Yield Stress Issues

    Apparently our boss doesn't know its capacity in tons so he assigned me to do it. Our section is overhauling of gearboxes, pulleys etc. And after these are fixed it is stacked in those racks. Our racks has 2-3 layers and the 25tons I have said was the capacity only of 1 layer. But I wondered...
  2. RJCanz

    Calculating Capacity of Steel Rack: Yield Stress Issues

    Hi guys. Recently I've been assigned to know / calculate the capacity of the racks in our section. Our racks has layered steel pipes that are carrying the loads. After actual testing it can carry a load around 25 tons after yielding or having a bend. So my next step was to calculate for its...
Back
Top