Traffic Flow - Junction, Delay, Webster, Greatest Upper Bound

MidnightR
Messages
39
Reaction score
0
[PLAIN]http://img96.imageshack.us/img96/7816/12530747.jpg

Hopefully this will post successfully...

Erm its the first part I'm not sure on, after that it's easy. I'm just not understanding the wording.

I need to work out the effective green time during the cycle
 
Last edited by a moderator:
on Phys.org
I believe since q = 0.7 then g > or = 0.35c what would this make the greatest lower bound? g = 0.35c?
 
Last edited:
Think I got it,

c=? q=0.7 s=2 therefore

g/c <=1
0.35c/g <= 1

therefore

g <= c <= g/0.35

we know c = g +10 so g= 10-c & sub in

c-10 <= c <= (c-10)/0.35

so assuming c is positive then

c >= 200/13 so take greatest lower bound = 200/13

however I'm still not sure that c = g+10 rather than c=2g+10
 
Last edited:

Similar threads

  • · Replies 6 ·
Replies
6
Views
2K
  • · Replies 0 ·
Replies
0
Views
6K
  • · Replies 1 ·
Replies
1
Views
9K
  • Sticky
  • · Replies 48 ·
2
Replies
48
Views
72K
  • · Replies 2 ·
Replies
2
Views
12K
  • · Replies 1 ·
Replies
1
Views
4K
  • · Replies 15 ·
Replies
15
Views
7K
  • · Replies 7 ·
Replies
7
Views
4K
  • · Replies 7 ·
Replies
7
Views
4K
  • · Replies 2 ·
Replies
2
Views
4K