Data Analysis Fun: Helping Cow Industrials Ltd Reduce Absenteeism

AI Thread Summary
Cow Industrials Ltd is facing customer complaints due to substandard products and late deliveries, primarily attributed to high absenteeism among the workforce. The Production Manager has identified a correlation between absenteeism and production issues, prompting an investigation into factors influencing employee attendance. A sample of ten employees will be analyzed based on age, holiday entitlement, and hourly pay rates to identify trends. The analysis aims to provide actionable insights to reduce absenteeism and improve production efficiency before the upcoming presentation to the Board of Directors. Comprehensive data analysis is essential to address these challenges effectively.
soph.
Messages
4
Reaction score
0
Looking for guidance on the following: The text outlines a company's problem, and ways to solve it. Results are hypothetically to be presented to the 'Board of Directors' ina week's time. Help please!

Cow Industrials Ltd is a medium sized Engineering Company. A number of their regular customers have made complaints over the last few orders they have received from Cow Ltd. These complaints are as follows:

• Products have been of a substandard nature
• Products are arriving late
• A combination of the above

Some of the customers have threatened that if this continues, then they will cancel their future orders and find another local supplier.

Consequently, the Managing Director has asked the Production Manager to investigate this immediately. He has replied, saying that he cannot meet production and deadline targets, because a large number of his workforce is constantly absent. He has done some basic statistical calculations and says there is strong correlation between production and workers attendance. Clearly something must be done about this, as the company does not want to lose their valued customer base.

The company has therefore called you in, the Information Analyst, to help the Production Manager. You are being asked to give advice regarding the absenteeism of the production workforce, and your brief is to analyze certain factors to try and reduce this high absenteeism and therefore increase production.

After an initial discussion with the Production Manager, you have decided to take a representative sample of ten employees and look at three possible factors – the age of the employee, their holiday entitlement and their hourly rate of pay (grade) - that may affect absenteeism. The Production Manager has given you the required data for each employee in your sample:

EMPLOYEE DAYS PAY HOLIDAY AGE
A 12 B 25 18
B 14 C 25 57
C 10 B 25 44
D 18 C 20 32
E 6 A 30 21
F 4 A 30 19
G 20 E 20 23
H 19 D 20 39
I 28 E 15 45
J 7 B 30 52

N.B. Employees are paid different hourly rates depending on their grade. These are as follows:

Grade A - £ 10.00 per hour
Grade B - £ 8.00 per hour
Grade C - £ 7.00 per hour
Grade D - £ 6.00 per hour
Grade E - £5.00 per hour
Grade F - £4.75 per hour

In a week’s time, the Production Manager and Managing Director will be asking a variety of questions regarding the above data. You are therefore advised to comprehensively analyze this data and do your calculations.

Hope you can help meee :)
 
Last edited:
Physics news on Phys.org
What do you need help with? Have you started looking at the basic data? Are there any kinds of trends or coincidences in the data? What have you done?
 
I multiplied the values first without the error limit. Got 19.38. rounded it off to 2 significant figures since the given data has 2 significant figures. So = 19. For error I used the above formula. It comes out about 1.48. Now my question is. Should I write the answer as 19±1.5 (rounding 1.48 to 2 significant figures) OR should I write it as 19±1. So in short, should the error have same number of significant figures as the mean value or should it have the same number of decimal places as...
Thread 'A cylinder connected to a hanging mass'
Let's declare that for the cylinder, mass = M = 10 kg Radius = R = 4 m For the wall and the floor, Friction coeff = ##\mu## = 0.5 For the hanging mass, mass = m = 11 kg First, we divide the force according to their respective plane (x and y thing, correct me if I'm wrong) and according to which, cylinder or the hanging mass, they're working on. Force on the hanging mass $$mg - T = ma$$ Force(Cylinder) on y $$N_f + f_w - Mg = 0$$ Force(Cylinder) on x $$T + f_f - N_w = Ma$$ There's also...
Back
Top