Calculating Final Velocity with Given Work and Mass

Join the discussion
Registration is free. Ask a follow-up in this thread, or start your own.
3 replies · 2K views
dasher141
Messages
1
Reaction score
0

Homework Statement


I don't know how to solve this question.

28.8J of work were done in accelerating a mall of 1.8 kg from rest. Find its final velocity. I'm not sure which formula to use..

Homework Equations


F=ma
W=Fs
KE=1/2 mv^2

The Attempt at a Solution


I can't figure out which formula to use. (did some working in my workbook)
 
Physics news on Phys.org
Hi dasher141. http://img96.imageshack.us/img96/5725/red5e5etimes5e5e45e5e25.gif

Work and Energy have the same units, so are basically the same thing. I like the formula "work done = change in kinetic energy"
 
Last edited by a moderator:
A=Wk2-Wk1, Wk1=0 →
→ A=Wk1=mV2/2 → V=[itex]\sqrt{}(2A/m)[/itex]
 
Sorry, made a mistake in second line. A=Wk2