Calculating Final Velocity Using Force-Displacement Graph

Click For Summary

Homework Help Overview

The discussion revolves around calculating the final velocity of a 9.9 kg object using a Force vs. Displacement graph, given its initial velocity of 28.6 m/s and a displacement of 30 m. Participants explore the relationship between work done, force, and kinetic energy.

Discussion Character

  • Exploratory, Conceptual clarification, Mathematical reasoning, Assumption checking

Approaches and Questions Raised

  • Participants discuss the equations for work and kinetic energy, questioning which force to use for calculating work done at a specific displacement. There is mention of the area under the graph representing work and the need to sum areas of geometric shapes to find total work. Some participants express confusion over whether the calculated final velocity can exceed the initial velocity.

Discussion Status

Several participants have offered guidance on calculating work from the graph and have engaged in discussions about the implications of their calculations. There is a recognition of the need to clarify the relationship between work done and changes in kinetic energy, with some participants confirming their calculations and discussing units of measurement.

Contextual Notes

Participants are working under the assumption that the Force vs. Displacement graph provides sufficient information to calculate work done, and there is an ongoing exploration of how to interpret the graph accurately. Some participants express uncertainty about the implications of their results, particularly regarding the final velocity exceeding the initial velocity.

df102015
Messages
27
Reaction score
1

Homework Statement


If the following Force v. Displacement graph is for a 9.9kg object and it's initial velocity is 28.6 m/s the what is its velocity at 30 m?
0406768d-b992-4a57-9d87-a50f2b36ebc3.gif


Homework Equations


I am not certain that i am even using the right equations with this but:

W = fd
KE = 1/2mv(final)^2 - 1/2mv(initial)^2

The Attempt at a Solution


I thought since W=Fd and work is proportional to kinetic energy, which is
KE=1/2mv(final)^2 - 1/2mv(initial)^2 and i then could substitute in the Fd, making the new equation:

Fd = 1/2mv(final)^2 - 1/2mv(initial)^2

This could then be rearranged to find final velocity:

sqrt { (Fd + 1/2mv(initial)^2) / 1/2m } = v(final)

Only the issue is that i do not know which F to use to find the final velocity at d=30meters. Because if i use the 0 the whole Fd cancels out, and i get the wrong answer. But if i use 100 then it comes out as larger than the initial velocity, which is not possible as it is losing speed due to lack of force after 20 meters.
 
Physics news on Phys.org
df102015 said:
If the following Force v. Displacement graph is for a 9.9kg object and it's initial velocity is 28.6 m/s the what is its velocity at 30 m?

Actually work done is a scalar product of force and displacement vector and the amount of work done is sored with the body as kinetic energy so calculate the work done from the graph and use it to find the final velocity.
 
  • Like
Likes   Reactions: df102015
drvrm said:
Actually work done is a scalar product of force and displacement vector and the amount of work done is sored with the body as kinetic energy so calculate the work done from the graph and use it to find the final velocity.

thanks, haha so i was way off, isn't work then supposed to be the area under the line on the graph?
 
df102015 said:

Homework Statement


If the following Force v. Displacement graph is for a 9.9kg object and it's initial velocity is 28.6 m/s the what is its velocity at 30 m?
0406768d-b992-4a57-9d87-a50f2b36ebc3.gif


Homework Equations


I am not certain that i am even using the right equations with this but:

W = fd
KE = 1/2mv(final)^2 - 1/2mv(initial)^2

The Attempt at a Solution


I thought since W=Fd and work is proportional to kinetic energy, which is
KE=1/2mv(final)^2 - 1/2mv(initial)^2 and i then could substitute in the Fd, making the new equation:

Fd = 1/2mv(final)^2 - 1/2mv(initial)^2

This could then be rearranged to find final velocity:

sqrt { (Fd + 1/2mv(initial)^2) / 1/2m } = v(final)

Only the issue is that i do not know which F to use to find the final velocity at d=30meters. Because if i use the 0 the whole Fd cancels out, and i get the wrong answer. But if i use 100 then it comes out as larger than the initial velocity, which is not possible as it is losing speed due to lack of force after 20 meters.

As the force changes over time, The best way to find the work in graphs is by getting the area
KhJXEzh.png


You have a triangle and a rectangle. Find the area and sum it up. You will end you will the the work done
 
  • Like
Likes   Reactions: df102015
df102015 said:
Only the issue is that i do not know which F to use to find the final velocity at d=30meters. Because if i use the 0 the whole Fd cancels out, and i get the wrong answer. But if i use 100 then it comes out as larger than the initial velocity, which is not possible as it is losing speed due to lack of force after 20 meters.

in the graph the value of force and displacement is given so calculate the work done
 
Biker said:
As the force changes over time, The best way to find the work in graphs is by getting the area
KhJXEzh.png


You have a triangle and a rectangle. Find the area and sum it up. You will end you will the the work done

And do i use the numbers of the x and y axes to find area? in this case the rectangle being 100x20 and the triangle as 1/2x100x10 ?
 
i keep getting an answer larger than the initial velocity of 28.6, is that at all possible?
 
Biker said:
As the force changes over time, The best way to find the work in graphs is by getting the area
KhJXEzh.png


You have a triangle and a rectangle. Find the area and sum it up. You will end you will the the work done

I got 2500 for the work, is that correct?
 
I haven't calculated the velocity but it should be larger than the initial. Work is adding energy to the system. You add more energy this energy will be kinetic. While the mass and 0.5 obviously don't change then the only thing that will change is the velocity.

and the work is 2500 right :D

So yes it should be larger.
 
  • #10
df102015 said:
I got 2500 for the work, is that correct?
Yes. So, show us your detailed calculations for getting the final velocity. Incidentally, what are the units.
 
  • Like
Likes   Reactions: df102015
  • #11
Chestermiller said:
Yes. So, show us your detailed calculations for getting the final velocity. Incidentally, what are the units.

W = 1/2mv(final)^2 - 1/2mv(initial)^2
2500 = (0.5 x 9.9 x V^2) - (0.5 x 9.9 x 28.6^2)
2500 = 4.95V^2 - 4048.9
6548.9 = 4.95V^2
1323.0 = V^2
36.4 = v(final)

Units:
W is in Joules
Mass is in kilograms
Velocity is in meters per second
Displacement is in meters
Force is in Newtons
 
  • #12
I didn't check your arithmetic, but your approach looks OK.
 
  • Like
Likes   Reactions: drvrm and df102015
  • #13
Chestermiller said:
I didn't check your arithmetic, but your approach looks OK.

Thank you, i got the right answer, just checked it! (:
 
  • Like
Likes   Reactions: drvrm

Similar threads

Replies
15
Views
2K
Replies
2
Views
904
Replies
6
Views
2K
  • · Replies 17 ·
Replies
17
Views
2K
  • · Replies 9 ·
Replies
9
Views
1K
Replies
7
Views
1K
  • · Replies 8 ·
Replies
8
Views
2K
  • · Replies 10 ·
Replies
10
Views
3K
  • · Replies 13 ·
Replies
13
Views
1K
  • · Replies 3 ·
Replies
3
Views
2K