To connect a synchronous generator to the electrical grid, it's essential to coordinate with the local utility, which will inspect the installation. The project involves using two circuit breakers: one for automatic synchronization and another for the main connection. Determining the cable cross-section requires understanding the maximum current, which is influenced by the protection settings on the circuit breakers rather than just the generator's rated output. It's advised to refer to relevant standards for cable sizing and to ensure that the generator's operational current is managed to prevent overheating. Proper research on protection settings is crucial to ensure safe and effective operation.