Small single-stage biogas plant design and methane production time

  • Thread starter Thread starter charles2007
  • Start date Start date
  • Tags Tags
    Design Plant
Join the discussion
Registration is free. Start your own thread to ask a follow-up.
2 replies · 2K views
charles2007
Messages
2
Reaction score
0
Hello,
Does anyone has a design of a type-small one stage biogas plant (CAD). Does anyone know how long will it take to get methane out from the fermentation plant? Please help.

Thanks in advance.
 
Physics news on Phys.org
Two quick points:

You would probably do better in the chemistry forum.

There was a lot of interest in methane generation and anerobic digesters back in the 1970s(remember the Opec embargo). If you can find them you might try "Mother Earth News" during those years; they had a lot of related articles during that period in sort of a do-it-yourself vein. As I dimly recall, the digester period was probably somewhere around thirty days.

KM