Calculating horizontal Wire Cable Load

Click For Summary
SUMMARY

The discussion focuses on calculating the maximum safe working load for a zip line constructed with a 3/8 inch aircraft cable rated for 14,400 lbs, supported by 16" x 10" x 1/4" steel i-beams embedded in concrete. The current load is 210 lbs, but concerns arise regarding dynamic loads and fatigue over time. Key calculations involve determining tension based on load and angle, as well as energy absorption using the formula 0.5 * force * distance. A safety factor of at least 2:1, ideally 5:1, is recommended for added security.

PREREQUISITES
  • Understanding of tensile strength and material properties of cables
  • Knowledge of static and dynamic load calculations
  • Familiarity with safety factors in engineering design
  • Basic principles of energy absorption in mechanical systems
NEXT STEPS
  • Research "static vs dynamic load calculations" for cable systems
  • Learn about "energy absorption in tensile structures" and related formulas
  • Study "safety factors in engineering design" for structural integrity
  • Explore "mechanical engineering guidelines" for zip line construction
USEFUL FOR

Engineers, zip line designers, and safety inspectors involved in the construction and evaluation of cable systems will benefit from this discussion.

gcheris
Messages
2
Reaction score
0
We've installed a 'zip line' and are trying to figure the maximum load it can safely carry. To date, it has handled, without complaint, 210 lbs. This is fine except over time an overload will obviously weaken the cable - we don't want to do that!

The line is a 3/8th inch aircraft cable (14,400 lbs test) attached to upright 16" x 10" x 1/4" steel i-beams which are embedded in 5' deep x 4' diamenter concrete plus the tops are anchored, via the same 3/8th inch cable, apx 8' to the rear in more concrete. The attachment point on one i-beam is 11' above the other i-beam.

The trolly is a commercially mfg 14,400 lb test unit.

The deflection is about 14-20" over the 275' span (a sight guess).

Does anyone know of a formula to determine the maximum safe working load? :confused:
 
Physics news on Phys.org
If you have a purely static load on the cable, by my calculations the tension on the cable will be twice the supported weight if the angle is 15 degrees and the weight is in the center.

But this doesn't really address the safety factor that you need for dynamic loads, or for fatigue.

One major concern will be the amount of energy your system can absorb. This will be given by .5*force*distance, where force is the tensile strength at which the cable starts to stretch, it's elastic limit, and distance is the amount the cable stretches when this amount of force is supplied. The distance the cable stretches depends on it's stiffness. There are various figures out there on the net, but I'm hesitant to supply any details because I don't want to get sued if I'm wrong :-).

Over and above this, you'll want to have some safety factor, at least 2:1, and probably more like 5:1.

Probably a mechanical engineer can give you a better answer than I can.
 
gcheris said:
We've installed a 'zip line' and are trying to figure the maximum load it can safely carry. To date, it has handled, without complaint, 210 lbs. This is fine except over time an overload will obviously weaken the cable - we don't want to do that!

The line is a 3/8th inch aircraft cable (14,400 lbs test) attached to upright 16" x 10" x 1/4" steel i-beams which are embedded in 5' deep x 4' diamenter concrete plus the tops are anchored, via the same 3/8th inch cable, apx 8' to the rear in more concrete. The attachment point on one i-beam is 11' above the other i-beam.

The trolly is a commercially mfg 14,400 lb test unit.

The deflection is about 14-20" over the 275' span (a sight guess).

Does anyone know of a formula to determine the maximum safe working load? :confused:


I would prefer to see some drawing or scheme of the structure described. Do you mind drawing one?
 
Thanks

Thanks to all who supplied info, it will help in solving the problem.
 
Good luck! I just wanted to clarify my remarks about high dynamic loads and energy a bit. Consider taking a large weight, putting it near the middle of your rig, and letting it drop a bit. If your cable system is very stiff, the weight will stop very suddenly, generating a very large force on the cable. This is what I mean by dynamic loading, and explains why I mentioend the energy absoprtion of the system as being of a concern. If you know the change in length of the cable that occurs at max rated load, you can calculate the rated energy absorption from .5*force*change-in-distance, as I mentioned. You'll have to judge for yourself how much energy the cable system might have to absorb, unless you can find some engineering guidelines somewhere. A couple of scenarios would be m*g*h, for a mass m suddenly dropped a distance h, or .5*m*v^2, for something sliding along the zipline at velocity v that stopped suddenly because a pulley "stuck"
 
gcheris said:
...over time an overload will obviously weaken the cable...
A steel cable experiences little or no fatigue stress because its stress is virtually all tension: it will not weaken over time.
 

Similar threads

  • · Replies 1 ·
Replies
1
Views
5K
  • · Replies 5 ·
Replies
5
Views
2K
Replies
9
Views
11K
  • · Replies 12 ·
Replies
12
Views
10K