Optimizing Oil Spill Cleanup: Minimizing Costs with Additional Crews

  • Thread starter Thread starter SMA_01
  • Start date Start date
  • Tags Tags
    Modeling Oil
Click For Summary

Homework Help Overview

The problem involves optimizing the cleanup of an oil spill affecting 200 miles of shoreline within a 14-day deadline. The discussion centers around minimizing costs associated with hiring additional cleanup crews, considering both daily operational costs and potential fines for delays.

Discussion Character

  • Exploratory, Mathematical reasoning, Problem interpretation

Approaches and Questions Raised

  • Participants discuss the relationship between the number of crews and the time required to complete the cleanup. There are attempts to formulate equations for time and cost based on the number of crews employed.

Discussion Status

Some participants have begun to derive equations for time and cost, while others suggest substituting variables to further explore the relationships. There is an ongoing exchange of ideas regarding the formulation of these equations and the implications of the results.

Contextual Notes

Participants are working under the constraints of a 14-day deadline and the associated fines for delays. There is also a requirement to round up the calculated time to the nearest whole number when determining the number of crews needed.

SMA_01
Messages
215
Reaction score
0
An oil spill has fouled 200 miles of shoreline. The oil company responsible has been given 14 days to clean up the shoreline, after which a fine of $$10/day$ will be imposed. The local clean up crew can scrub 5 miles of beach per week at a cost of $500/day. Additional crews can be brought in at a cost of $18 plus $800/day for each crew. How many additional crews should be brought into minimize the total cost to the company?

I'm supposed to use these variables:

n= total number of crews, including the local crew

n_0=number of crews required to clean up the shoreline in exactly 14 days

t= number of days to clean up the oil spill

c= total cost (measured in thousands of dollars)

t=the amount of the fine (measure in thousands of dollars)

I'm stuck on this, I am having difficulty putting the pieces together. I'm supposed to find a formula for t in terms of n, t(n).

How can I relate the number of days to finish the job to the number of crews? How can I find the number of additional crews with my given variables?

I know that if t>14 or n<n0, then they will have to pay a fine...
 
Physics news on Phys.org
Hi SMA_01! :wink:

Do it step-by-step …

call the number of crews "n"

write the equation for the time it will take (as a function of n)

then write the equation for the cost (as a function of n) …

show us what you get. :smile:
 
  • Like
Likes   Reactions: 1 person
tiny-tim,

Thanks, I got

t(n)=280/n

c(t)=500t+(18+800t)(n-1), n>=20
c(t)=500t+(18+800t)(n-1)+10(t-14)
 
Hi SMA_01! :wink:

That looks good. :smile:

Now substitute your formula for t(n) into your two formulas for c(n).

(and don't forget the 280/n has to rounded up to the nearest whole number)
 

Similar threads

Replies
14
Views
2K
  • · Replies 49 ·
2
Replies
49
Views
8K
Replies
14
Views
3K
Replies
2
Views
7K
Replies
5
Views
5K
  • · Replies 67 ·
3
Replies
67
Views
16K
  • · Replies 26 ·
Replies
26
Views
5K
  • · Replies 11 ·
Replies
11
Views
6K
  • · Replies 10 ·
Replies
10
Views
10K
  • · Replies 2 ·
Replies
2
Views
4K