Steel Tubing Questions

  • Thread starter mudrat
  • Start date
  • #1
mudrat
3
3
TL;DR Summary
Class 3 lever design, how to calculate buckling at force point.
Hello, I am a retired electrical engineer who likes to tinker and invent. As I am getting older I find the moving of logs is getting harder to do, so I am thinking of building a boom crane to attach to the 3 pt hitch on one of my tractors.

The design would basically be a class 3 lever, with a distance of 16" from fulcrum to force, and 48" from force to load. With a max load of 500#, the force is 2000#.

Using A39 steel tube, 2" square, I am wondering about what wall thickness to use. There will be a reinforcing plate at the force point and a tension strap/rod along the top, but I am looking to calculate based on the simplified design of point load and force without any reinforcement of the tube.

It has been way to may years since my basic strength of materials courses in university to remember the formulas. Searching the net has only brought up distributed load on beams. It did bring me to this site!

I would just like to get an idea of how to calculate the strength needed to prevent buckling at the force point.

Mudrat
 

Answers and Replies

  • #2
jrmichler
Mentor
2,012
2,581
We need a sketch to properly understand your question.
 
  • #3
Baluncore
Science Advisor
12,351
6,424
  • #4
mudrat
3
3
The Hayes 500 kg unit is along the lines of what I am thinking of. It is twice the capacity, unknown boom length.

They use the equivalent of 3" x 2" 3/16" wall tube. Also at 60 kg it is heavier than what I want.
 

Suggested for: Steel Tubing Questions

Replies
3
Views
127
Replies
2
Views
737
  • Last Post
Replies
8
Views
1K
  • Last Post
Replies
1
Views
756
  • Last Post
Replies
6
Views
832
Replies
1
Views
611
  • Last Post
Replies
2
Views
2K
Replies
3
Views
1K
Replies
2
Views
1K
  • Last Post
Replies
2
Views
4K
Top