Was My Approach to Solving the Physics Problem Correct?

  • Thread starter Thread starter agent_509
  • Start date Start date
  • Tags Tags
    Word problem
Click For Summary
SUMMARY

The discussion centers on solving a physics problem involving a cannon exerting a force of 19,000 N on a cannonball with a desired exit speed of 79.3 m/s. The calculated mass of the cannonball is 11.56 kg. The user employed a vector-valued function to analyze the work done, integrating the force along the path of the cannonball. Feedback indicated that while the approach was valid, it was unnecessarily complex for the problem at hand, emphasizing the importance of simplicity in problem-solving.

PREREQUISITES
  • Understanding of Newton's laws of motion
  • Familiarity with work-energy principles
  • Knowledge of vector calculus
  • Ability to perform line integrals
NEXT STEPS
  • Study the concept of work done by a variable force
  • Learn about vector-valued functions in physics
  • Explore simplifications in physics problem-solving
  • Investigate more complex motion problems involving non-linear paths
USEFUL FOR

Students studying physics, educators teaching mechanics, and anyone interested in mastering problem-solving techniques in classical mechanics.

agent_509
Messages
46
Reaction score
0

Homework Statement


You are in charge of a cannon that exerts a
force 19000 N on a cannon ball while the ball
is in the barrel of the cannon. The length of
the cannon barrel is 1.92 m and the cannon is
aimed at a 37° angle from the ground.

The acceleration of gravity is 9.8 m/s^2.

If you want the ball to leave the cannon
with speed v0 = 79.3 m/s, what mass cannon
ball must you use?

Homework Equations



W=∫C F•dx

The Attempt at a Solution



I already have done the problem, the answer is 11.56kg. My question is if the way I solved this problem was ok. i got several points docked for the way I answered it.

I wanted to make sure I understood the concept well enough to apply it to more complex problems, such as ones where the path taken by an object was not a straight line and the force varied with position, so I made the path taken into a vector valued function r(t) where 0≤t≤1 (t is arbitrary since I'm calculating work right?) and then combined the force of gravity with the force exerted by the cannon into a force field existing along the path taken by the cannonball. I calculated dr from the vector-valued function, and solved the line integral. Of course the whole thing only turned out to be the force dotted into the path taken by the cannonball anyways, but I was just trying to make sure I understood the concept.

So my question is this: is there something wrong with the way I solved the problem?

Edit: I meant "work problem" not word problem, my apologies.
 
Last edited:
Physics news on Phys.org
You got the right answer, that is good. Sounds like you made the problem more complicated then it needed to be. Time is money, keep it simple.
 
I'm aware of that. Like I said I just wanted to make sure I understood how I could solve more complicated versions of the problem. thanks.
 

Similar threads

  • · Replies 11 ·
Replies
11
Views
2K
Replies
3
Views
2K
  • · Replies 9 ·
Replies
9
Views
2K
  • · Replies 4 ·
Replies
4
Views
3K
  • · Replies 10 ·
Replies
10
Views
6K
Replies
9
Views
3K
  • · Replies 1 ·
Replies
1
Views
2K
  • · Replies 1 ·
Replies
1
Views
4K
Replies
3
Views
6K
  • · Replies 2 ·
Replies
2
Views
3K