Consider this pulley:
http://67.18.37.18/1014/142/upload/p1957458.png
There has been some discussion at a forum whether this pulley reduces the necessary force to 1/2 or to 1/3 of a "non-pullied" rope. I'm strongly for 1/3 basically since for each distance the lower pulley moves all 3 ropes...