Recent content by tj00889

  1. T

    Utilizing Fan Coil Unit return to fullfill fresh air requirements

    The fans are constant speed and cycling. What I am worried about is if the positive pressure buildup in the room would stop fresh air supply all together. There is also the issue that seeing as there is no way to maintain the building at positive pressure with this configuration, I was wondering...
  2. T

    Cooling load calculations for hotel rooms

    i meant losses to the toilet through the partition wall, If I am considering the cooled area to include the toilet , I would not consider the partition wall separating the toilet and the room because I am assuming the toilet and room are at the same temperature.
  3. T

    Cooling load calculations for hotel rooms

    When performing cooling load calculations of an hotel room, do I consider the toilet as part of the area being cooled as it is at negative pressure with respect to the room and cooled air will flow from the room into the toilet. Or should I perform and the load of the room separately and add...
  4. T

    Dealing with Detergents in sewage treatment plants

    Hey Guys, I was wondering in Sewage treatment plants ,how are detergents (Bleach and such )generally dealt with ,especially if the treated output is expected to be used in agricultural applications and such . Thank You
  5. T

    Very Rough Feasibility of a prospective village sewage treatment plant

    Hey Guys, I would like to know from some of the more experienced engineers out there how you would go about ball-pointing the feasibility of a sewage treatment plant at the get go. In other words ,before anyone decides to spend any money on a thorough feasibility study. Namely ,I'm interested...
Back
Top