If one is contemplating a nuclear plant or production facility, these are just of the Review Plans and Standards one is required to meet. There is also 10 CFR 50 and the numerous Regulatory Guidelines (Reg Guides).
http://www.nrc.gov/reading-rm/basic-ref/srp-review-standards.html
Digging further, one has to find relevant SECY documents.
http://www.nrc.gov/reading-rm/basic-ref/srp-review-standards.html
The U.S. Nuclear Regulatory Commission (NRC) has a number of standard review plans (SRPs) for staff use in reviewing proposed licensing actions. These actions may relate to constructing, operating, or decommissioning a nuclear facility or possessing, using, storing, or transporting nuclear materials or waste.
For nuclear power plants, the NRC has a comprehensive standard review plan (NUREG-0800). For other types of licensing actions, the NRC has developed review standards as adjuncts to NUREG-0800 for staff use in reviewing licensing applications for early site permits and power uprates. These review standards reference sections of either NUREG-0800 or the "Standard Review Plan for Environmental Reviews for Nuclear Power Plants" (NUREG-1555). If either of those publications lacks information on a new topic to be reviewed, the staff adds a new section for the topic.
Digging further, one has to find relevant SECY documents.