I am wanting to calculate the theoretical packs per minute of a machine. The machine pushes packs into a indexing conveyor and is transported along the conveyor and is cross pushed on to an exit conveyor.
Each pack is 144 mm long and the machine indexes every 0.65s plus a 1.4 second dwell for a cross push on an exit conveyor.
The length of the conveyor is 1.4m.
What is the methodology of calculating the packs per minute?