Recent content by mithleshkj
-
M
2 post lift with lead screw and rope drive
I have discussed with rope manufacturer and asked them regarding pre loading and pre stretching,but that also is not working out. #weight can't be kept on carriage all the time as weight has to bring down.when load is not in the carriage,difference of 10mm is cmoing which is going to 50-60mm...- mithleshkj
- Post #7
- Forum: Mechanical Engineering
-
M
2 post lift with lead screw and rope drive
even after using pre loading wire rope, i am facing the same issue. rope is getting tightened once load is acting on it. without load, it is slacking- mithleshkj
- Post #5
- Forum: Mechanical Engineering
-
M
2 post lift with lead screw and rope drive
it is not possible to adda spring as end of wire rope got clamping connector thread rod type to tighten it.also this wire rope will be keep on moving on pulley. any other way?- mithleshkj
- Post #4
- Forum: Mechanical Engineering
-
M
2 post lift with lead screw and rope drive
Actually i am using lead screw drive by motor along with rope drive. If you will see the attachment, yuo can clearly understand the working principle. In this working priniciple, when we used to start the motor, carriage power use to go up through lead screw drive.Rope is connected to this...- mithleshkj
- Thread
- Drive Lead Lift Rope Screw
- Replies: 6
- Forum: Mechanical Engineering
-
M
Motor torque calculation for lift having chain drive
i want to know how to calcuate Starting and running for motor in 2 post lift for lifting 3.0T. Actually i have 2 columns having trapezoidal screw rod and nut in each side. One column is getting drive by motor through pulley belt mechanism. Another shaft is getting driven by chain at the...- mithleshkj
- Thread
- Calculation Chain Drive Lift Motor Torque
- Replies: 1
- Forum: Mechanical Engineering