Calculating Work Done on a Crate on an Incline

  • Thread starter Thread starter teggenspiller
  • Start date Start date
  • Tags Tags
    Acceleration Work
Join the discussion
Registration is free. Ask a follow-up in this thread, or start your own.
6 replies · 3K views
teggenspiller
Messages
94
Reaction score
0

Homework Statement



A n 80-N crate is pushed a distance of 5.0 m upward along a smooth incline that makes an angle of 30 o with the horizontal. The force pushing the crate is parallel to the slope. If the speed of the crate increases at a rate of 1.5 m/s2, find the work done by the force:
A. 200 J
B. 1 J
C. 140 J
D. 200 J
E. 260 J



Homework Equations





The Attempt at a Solution



fnet=ma
fnet= (80/9.8)*(1.5)
12.24

w=12.24*5meters

w=61J


not an option!
aplease help
 
Physics news on Phys.org
i think it is 200J after all
 
teggenspiller said:
i think it is 200J after all

What is your reasoning? Can you show your calculations?
 
yes right. 200J
 
supratim1 said:
yes right. 200J

Really?

The crate's on a 30° slope, so half of its 80N weight will be pressing downslope (since sine of 30° is 1/2). The net force to produce the desired acceleration was previously calculated to be 12.34N. So the upslope force required to yield this net force will be 12.34N + 40N, or 52.24N. How do you conclude that the work done is 200J, which is only 40N*5.0m?
 
listen to Gneill, 200J is not the correct answer. Remember, you're trying to the find the work done by the force that is being applied to the crate. Determine what that force is and it should be straightforward from there.