How Does Reaction Time Impact Driving Distance and Safety?

  • Thread starter Thread starter zeo2396
  • Start date Start date
  • Tags Tags
    Homework
Click For Summary

Homework Help Overview

The discussion revolves around the impact of reaction time on driving distance and safety, focusing on scenarios involving vehicles traveling at specific speeds and the effects of varying reaction times on stopping distances.

Discussion Character

  • Exploratory, Conceptual clarification, Assumption checking

Approaches and Questions Raised

  • Participants are attempting to understand how to calculate distances based on reaction times and speeds. Questions about the definition and implications of reaction time in driving contexts are raised, along with requests for clarification on velocity concepts.

Discussion Status

Some participants are seeking help with the calculations and expressing uncertainty about the concept of reaction time. Others are prompting for foundational knowledge regarding velocity and its relation to the problems presented.

Contextual Notes

There is mention of a new school environment and a lack of familiarity with the term "reaction time," indicating potential gaps in foundational knowledge that may affect understanding of the problems.

zeo2396
Messages
9
Reaction score
0
1. An automobile is traveling at 60 feet/sec (40mph).
a) If the reaction is 0.5 seconds, how far does the automobile travel in this time?
b) How much farther will the automobile travel if the driver is distracted by talking on a cellphone, so that the reaction time increases to 1.5 seconds?

2. Imagine a driver in an automobile in traffic moving at 40 feet/second (28 mph). The driver ahead has collided with another vehicle and has stopped suddenly. How far behind the preceding automobile should a driver be to avoid hitting it, if the reaction time is 0.5 seconds?

3. An automobile is traveling at 60ft/s. How many automobile lengths does it travel per second? ( A typical car length is 15 ft. (about 5 meters)
 
Physics news on Phys.org
Please show your work and tell us what you really need help with
 
cupid.callin said:
Please show your work and tell us what you really need help with

Typically, I've just gone to a new school this semester and the teacher gave me these questions, I knew how to solve velocity, time, distance but the word "reaction time" seems new to me, so that I don't know how to do do these problems
 
Can anyone help me!
Thanks!
 
reaction time is a time, that's all.

What do you know about velocity? Do you have a formula or definition for it?
 
localrob said:
reaction time is a time, that's all.

What do you know about velocity? Do you have a formula or definition for it?

Well, in the context of driving, reaction time generally refers to the time between when the driver recognize that a collision is imminent and the moment he manages to put his foot on the brake.
 

Similar threads

  • · Replies 1 ·
Replies
1
Views
2K
Replies
1
Views
2K
  • · Replies 1 ·
Replies
1
Views
11K
Replies
4
Views
5K
  • · Replies 7 ·
Replies
7
Views
6K
  • · Replies 12 ·
Replies
12
Views
2K
  • · Replies 1 ·
Replies
1
Views
5K
  • · Replies 4 ·
Replies
4
Views
8K
Replies
1
Views
2K
  • · Replies 3 ·
Replies
3
Views
4K