What is the method for finding peak time from a given diagram?

  • Thread starter Thread starter princejan7
  • Start date Start date
  • Tags Tags
    Peak Time
Click For Summary
SUMMARY

The discussion focuses on determining the peak time and percentage overshoot (%OS) from a given diagram. The user initially believes the peak time is around 1.1 seconds, but the correct value is identified as 0.0922 seconds. The lack of scale information on the X and Y axes in the diagram significantly affects measurement accuracy. It is clarified that the peak time should be measured from the step transition, which occurs after t = 1.

PREREQUISITES
  • Understanding of control system terminology, specifically "peak time" and "%OS".
  • Familiarity with interpreting graphical data, particularly in control systems.
  • Knowledge of time-domain analysis in system response.
  • Ability to measure and analyze data points accurately from diagrams.
NEXT STEPS
  • Research methods for accurately measuring peak time from control system response graphs.
  • Study the concept of percentage overshoot (%OS) in control systems.
  • Learn about the significance of time-domain specifications in system performance analysis.
  • Explore tools for plotting and analyzing control system responses, such as MATLAB or Python libraries.
USEFUL FOR

Students studying control systems, engineers involved in system design and analysis, and anyone interested in accurately interpreting graphical data in engineering contexts.

princejan7
Messages
93
Reaction score
0

Homework Statement


I am trying to find the peak time and %OS from the diagram

Homework Equations

The Attempt at a Solution


I know how to get the %OS but for the peak time, isn't it just the time of the first peak, so around 1.1s? But the answer I am supposed to be getting is 0.0922s
 

Attachments

  • Untitled.png
    Untitled.png
    7 KB · Views: 488
Physics news on Phys.org
Your attached figure lacks information concerning the scales on the X and Y axes, and the observed peak is crowded towards the left side of the image and won't yield much in the way of accuracy for measurements made on it concerning that peak. The answer you claim that you're suppose to get for the time of the peak has three significant figures. Do you think you can measure to that kind of accuracy on the given image?

The peak time is likely to be the amount of time after the step transition that the peak occurs. Note that the step does not happen at t = 0 in the figure; the step occurs at t = 1 <something>. Where the <something> is meant to represent the units that aren't specified...
 

Similar threads

Replies
7
Views
1K
Replies
1
Views
3K
  • · Replies 1 ·
Replies
1
Views
2K
  • · Replies 3 ·
Replies
3
Views
2K
  • · Replies 29 ·
Replies
29
Views
3K
  • · Replies 9 ·
Replies
9
Views
3K
  • · Replies 7 ·
Replies
7
Views
2K
Replies
4
Views
5K
  • · Replies 10 ·
Replies
10
Views
3K
  • · Replies 1 ·
Replies
1
Views
4K