- #1
member 392791
Hello,
I was wondering if it is allowed when doing problems on multiple unit mass balances to switch the basis made at the beginning of the problem and apply it to a new control volume, while keeping the old basis for previous control volumes?
Thank you
I was wondering if it is allowed when doing problems on multiple unit mass balances to switch the basis made at the beginning of the problem and apply it to a new control volume, while keeping the old basis for previous control volumes?
Thank you