The mix design will remain the same but it will be broken into 2 parts. Recycled material and virgin material. the new computer program needs it entered as 100% recycled and 100% virgin material totals.
So just for example 37% of the total mix is recycle but i have to enter this to total 100%...
Hi, I am new to forums in general, but here goes. i have found myself stumped over a basic math problem with a new operating system on an asphalt plant I operate. I am sure there is a simple forumla to solve this.
the mix design or "recipe" calls for percentages of stone and sand totaling 100...