Homework Statement



How much would the owner of a building be justified in paying for a sprinkler system that will save $750 a year in insurance premiums, if the system has to be replaced every 20 yrs and has a salvage value equal to 10% of its initial cost? Assume money is worth 7%.


The Attempt at a Solution



I just don't know where to commence, although the book does have the answer of $8156, I could place the answer, but I want to learn how to do this problem, as the answer won't be given to me on the test. :blushing:

Also, forgive me if this forum does not offer help in these type of problems, but since I saw engineering and this is an engineering course, then I just went for it. :biggrin:
 
on Phys.org
One has to determine the Present Worth (PW) of the periodic savings $750/yr and the one time salvage value over the 20 year lifetime.

Does one have access to a book or resource on how to treat PW based on periodic payments and future worth (FW)?