You've never built a large engineering project, have you? Labor is a large, often dominant, part. You also need to figure out what buying all the land costs you.
Yea I intentionally excluded land costs, because most infrastructure projects have them in one form or the other.(And varies a lot city to city) I should have mentioned it in my post though. The footprint itself should be much smaller than typical rail infrastructure.Vanadium 50 said:You also need to figure out what buying all the land costs you.
In principle if you the standardize design, parts can be produced in a factory environment. Skytran claims it can be installed in days. It's different from a typical highway construction, which takes several months to a year.Vanadium 50 said:Labor is a large, often dominant, part.
You should see my new kitchen.Vanadium 50 said:You've never built a large engineering project, have you?
What proportion of the population would get to use Skytran? Its strikes me that Skytran falls between two stools. It seems to be pretty exclusive yet it gets in the way of the majority of travellers.Prathyush said:Skytran claims it can be installed in days.
Of course. The elites are important. It is our duty to provide them with their every need.sophiecentaur said:Are all the travellers in "congested streets" going to pay for the elite travellers zapping around above their heads? Any system that is not useable by the whole population can't be justified. What's needed is a system to red
We could balance the budget by adding a $100K tax per skyTran ride. The elites can afford it.Vanadium 50 said:Of course. The elites are important. It is our duty to provide them with their every need.
Long term planning and budgeting?Prathyush said:it can be built in a modular fashion over many years
Why not a billion? Think about all we could do with that much money!anorlunda said:We could balance the budget by adding a $100K tax per skyTran ride. The elites can afford it.
sophiecentaur said:What proportion of the population would get to use Skytran?
You will have part of tracks that are functioning, Same way rail infrastructure is built in a modular fashion.256bits said:Never works out the way the initial concept was planned.
As the political will changes, I would expect cancellations of parts of the project, or complete cancellation, and you end up with tracks to nowhere.
If 10000 people use each KM of track every day. And if you charge 10 cents per KM for infrastructure+running cost. Your pay back period is 14 years. That's a conservative estimate.Vanadium 50 said:Why not a billion? Think about all we could do with that much money!
Just a small little thing.Prathyush said:Say total cost is 5 million per KM after labor, electronics, switching mechanism and miscellaneous.
Rive said:Is your railroad-redesign able to be old and dirty?
Then please add some (ridiculous) amount of maintenance fee too.
I imagine there was a similar attitude to horses, when horseless carriages were introduced. We have had a love affair with the car and, more importantly my personal car. When you realize just what proportion of private vehicles are stationary / parked at anyone time, there is a strong message about over consumption (net carbon consumption). There are just too many (particularly new) cars about.Rive said:You can never get rid of roads, and consequently: cars,
I think we can extend it according to that without loosing anything from the meaning.sophiecentaur said:I imagine there was a similar attitude to horses, when horseless carriages were introduced.
You are correct about that. It's a matter of how necessary. People will use their cars for the most trivial journey and regard that as necessary. Living at the end of a farm track could really mean necessary. But a big chunk of a journey would not need to be by conventional car. But we're all carrying different models of this in our heads.Rive said:Personal cars may be a luxury here and there, but some other places it's still necessary parts of everyday life.
Rive said:So this is actually about to create a second set of roads (equivalents) in some areas, at the same cost and expect all this being economic?
Really?
Don't forget simple malfunctions and deliberate sabotage.Prathyush said:But designing around earthquakes
Short term solution on an existing network. An additional lane on a highway does reduce congestion initially, but after time the equilibrium returns and downloads onto downstream venues, an effect rarely taken into account, or downstream changes are impossible to implement due to land confinement, so the pain is spread over a wider region. A slightly democratic approach if you like.Prathyush said:Road infrastructure is constantly being expanded at a heavy cost to keep up with capacity. No amount of road capacity appears to solve the traffic congestion problem.
That would depend on more than the total number of passengers (although I feel includes to believe you). It would involve the number of terminals and the area covered by the system and the everyday timetable of the travellers.anorlunda said:Also remember that very large cities like Tokyo (37 million people) would find 100K passengers per hour a pitifully small fraction of their real needs.
sophiecentaur said:this thread suffers from the problem that everyone imagines a different model.
10/10Vanadium 50 said:The question is whatever it needs to be to have PodZ as the answer.
If you reach 100 K/hr passengers you can easily stack lines and reduce it the load. At 10 cents a KM. Your pay back period is in months. They can also be vertically stacked have as they have a small footprint.anorlunda said:Also remember that very large cities like Tokyo (37 million people) would find 100K passengers per hour a pitifully small fraction of their real needs.
anorlunda said:deliberate sabotage.
I think you can make just the guideway for around 5 million USD per KM possibly lesser too.Vanadium 50 said:$4M/km
Come on! Is this stuff all going to be suspended above existing roads? Did you consider that the public would need to be consulted and that every metre of the system would need planning permission?Prathyush said:I think you can make just the guideway for around 5 million USD per KM possibly lesser too.
Yes, that tricky always for anything.sophiecentaur said:Did you consider that the public would need to be consulted and that every metre of the system would need planning permission?
Yea perhaps. It was a crude estimate indeed.sophiecentaur said:Re-do your sums with that figure and add track costs, services, interchanges, terminals.
This is what 100k passengers per hour looks like in Mumbai local.Vanadium 50 said:All we really know is the answer is PodZ. The question is whatever it needs to be to have PodZ as the answer.
Another company that was incubated by NASA, Sky tran is quoting prices in the ball park of 15 million per KM(I believe all inclusive). One of the largest Indian company Reliance has taken interest in it. They claim it is equivalent to a 6 lane highway in terms of throughput.sophiecentaur said:The proposed system could be part of a funfair and possibly pay for itself over a few years.
I don't know the expression. What does it mean?Prathyush said:Yes, that trick always for anything.
Is that on a green field site or inserted in an existing city transport system?Prathyush said:15 million per KM(I believe all inclusive).
My bad, I wanted to say "that's always tricky".sophiecentaur said:I don't know the expression. What does it mean?
Couple of test projects they are building I think. One in Israel, in an important place and I think they are planning something in India also.(possibly 1-2 others too)sophiecentaur said:Is that on a green field site or inserted in an existing city transport system?