What is the Work Done Lifting a Chain?

Click For Summary

Homework Help Overview

The problem involves calculating the work done by a winch to lift a chain that is partially hanging. The chain is 40 feet long and weighs 3 pounds per foot, with the task being to find the work done in winding up 30 feet of the chain.

Discussion Character

  • Exploratory, Assumption checking, Mathematical reasoning

Approaches and Questions Raised

  • Participants discuss the formulation of the work done in lifting the chain, with some suggesting the need to account for the total hanging mass as a function of the length of chain already pulled in. Others question the initial setup and the integrand used in the calculations.

Discussion Status

There is an ongoing exploration of the correct integral setup, with participants providing guidance on adjusting the integrand to reflect the total length of the chain remaining. Some participants express confusion about the physics behind the calculations, while others clarify the relationship between the length of chain lifted and the force due to gravity acting on the hanging mass.

Contextual Notes

Participants note the importance of using the correct units (pounds and feet) and highlight the need to consider the entire length of the chain when calculating the work done. There is also mention of specific constraints from the assignment regarding the integral setup.

bluesurge863
Messages
24
Reaction score
0

Homework Statement



A chain 40 feet in length and weighing 3 pounds per foot is hanging fully extended from a winch. Find the work done by the winch in winding up 30 feet of the chain.

Homework Equations



Typical segment of the chain: \Delta y_{i}

Weight of typical segment of the chain: 3\Delta y_{i}

Distance of typical segment being lifted: 30 - c_{i}, where c_{i} is a point in the interval \Delta y_{i}

Work done in lifting typical segment: W = Fd = 3(30 - c_{i})\Delta y_{i}

The Attempt at a Solution



Total work done in lifting chain: 3\int_0^{30}(30-y)dy

I know this is wrong, I just don't know why.
 
Physics news on Phys.org
You need to write an equation for the total hanging mass as a function of how much mass has already been pulled in. Then the force of gravity on this hanging mass is the force that you're doing work against. You're close, but not quite there.
 
Also, you're given pounds and feet, make sure you're not expected to use Newtons and Meters.
 
If you take y as the distance down from the winch,
dW = Fd = 3*dy*y
Integrate that and you get the right answer, 1350.
Oh, you get the same answer with your integral!
It is right because in effect you are lifting the center of mass up 15 feet and W = Fd = 3*30*15 = 1350.
 
Delphi51 said:
If you take y as the distance down from the winch,
dW = Fd = 3*dy*y
Integrate that and you get the right answer, 1350.
Oh, you get the same answer with your integral!
It is right because in effect you are lifting the center of mass up 15 feet and W = Fd = 3*30*15 = 1350.

There's something missing here. You didn't account for the extra mass on the remaining 10 feet that wern't winched up. Immagine the chain were 100 feet long and you winched up 30 feet. This is still mass that would need to have been lifted.

This means the original integral is correct, excecpt that inside the integral should be 40-y rather than 30-y
 
Thanks flatmaster! I completely missed that 40 in the question.
 
Upon revising, I ended up with

900 + 3\int_{10}^{40}(30 - y)dy

Does this look a little better?

(Also note that the assignment is to find the integral, but not to work it out.)
 
Your first integral was better. Your entire integrand is the total leingth of chain remaining after a leingth of chain y has been pulled in. You simply needed to replace the initial leingth with 40 m instead of 30 m.
 
flatmaster said:
Your first integral was better. Your entire integrand is the total leingth of chain remaining after a leingth of chain y has been pulled in. You simply needed to replace the initial leingth with 40 m instead of 30 m.

OK, so

\int_0^{30}(40 - y)dy
 
  • #10
That result really makes no sense to me. I can figure out the math, I guess, but I can't see the physics in it.
 
  • #11
You lost the 3 you were multiplying by for density. Immagine the first bit of chain you pull up. y=0, so the integrand contains the entire 40 feet of cable. This is multiplied by the density of 3plb/ft to give you the total hanging mass of cable. Integrating from 0 to 30 corresponds to winding in the 30 feet. The leingth of cable left hanging changes continuiously as 40-y where y is the amount of cable that's been drawn in. Thus you integrate y from 0 to 30.
 

Similar threads

  • · Replies 1 ·
Replies
1
Views
3K
Replies
8
Views
3K
  • · Replies 5 ·
Replies
5
Views
4K
Replies
3
Views
6K
Replies
22
Views
5K
  • · Replies 6 ·
Replies
6
Views
7K
  • · Replies 2 ·
Replies
2
Views
3K
  • · Replies 14 ·
Replies
14
Views
8K
  • · Replies 2 ·
Replies
2
Views
4K
  • · Replies 7 ·
Replies
7
Views
2K