1. Limited time only! Sign up for a free 30min personal tutor trial with Chegg Tutors
    Dismiss Notice
Dismiss Notice
Join Physics Forums Today!
The friendliest, high quality science and math community on the planet! Everyone who loves science is here!

Building Management System

  1. May 13, 2014 #1
    Hello,
    does anyone know how much is the minimum required points that should be connected from the following units to the BMS:
    1) chiller
    2) AHU
    3) FCU
    4) Fan
    5) Pressurizing fan
    6) VAV with reheat coil
    7) VAV without reheat
    8) Pumps (secondary chilled water circuit)
     
  2. jcsd
  3. May 13, 2014 #2

    Bobbywhy

    User Avatar
    Gold Member

    Does the abbreviation "BMS" stand for "Building Management System"? If yes, then the required connections would normally be listed in the equipment specification and connection diagrams from the manufacturer.

    If no, then please provide more detailed information without using abbreviations. Thank you.

    Bobbywhy
     
  4. May 13, 2014 #3

    russ_watters

    User Avatar

    Staff: Mentor

    Yes, it is Building Management System. And the answer depends on the level of control and monitoring desired. IMO, the more the better! There is no one-size-fits-all answer.
     
    Last edited: May 13, 2014
Know someone interested in this topic? Share this thread via Reddit, Google+, Twitter, or Facebook




Similar Discussions: Building Management System
  1. Time Management (Replies: 1)

  2. Project Management (Replies: 12)

Loading...