Urgent calculation: design a construction lift...
the construction lift is used in a building construction project. the construction will raise building materials from ground level to any height up to 12.2m. The life will be at the top of a rigid scaffold that is not a part of the design project. it will raise a load up to 3kN at the rate of about 20cm/s. the load will be on a pallet (1m x 1.5m) the construction site is powered by 3 phase AC current , 460 voltage with 60 hertz electrical power supply. the construction lift is used for 12 hour per day. the structure to support the life is considered to be rigid... Question 1: motor selection, speed at sychronous speed and no. of pole, power rating of motor. Question 2 Narrow section V-belts recommended to use in this design! its service factor, design power. selected output speed, belt selection, driving sheave size and driven sheave size, actual output speed , center distance , belt length , no. of belt require. Question3: a speed reducer using spur gear by using 4 gear... the gears have a 20 degree pressure angle... find the no of teeth,size of teeth as indicated by the pitches, force and torque act on teeth, velocity ratio and train value ,speed of driving gear and driven gear, center distance. Question 4: chain drive (single strand roller chain is recommended) finf its service factor,design power ,velocity ratio,required no. of teeth on each sprocket, actual output speed, chain lenth,center distance, chain no and type of lubrication... please help me slove this problem... Thx a lot~
the construction lift is used in a building construction project. the construction will raise building materials from ground level to any height up to 12.2m. The life will be at the top of a rigid scaffold that is not a part of the design project. it will raise a load up to 3kN at the rate of about 20cm/s. the load will be on a pallet (1m x 1.5m) the construction site is powered by 3 phase AC current , 460 voltage with 60 hertz electrical power supply. the construction lift is used for 12 hour per day. the structure to support the life is considered to be rigid... Question 1: motor selection, speed at sychronous speed and no. of pole, power rating of motor. Question 2 Narrow section V-belts recommended to use in this design! its service factor, design power. selected output speed, belt selection, driving sheave size and driven sheave size, actual output speed , center distance , belt length , no. of belt require. Question3: a speed reducer using spur gear by using 4 gear... the gears have a 20 degree pressure angle... find the no of teeth,size of teeth as indicated by the pitches, force and torque act on teeth, velocity ratio and train value ,speed of driving gear and driven gear, center distance. Question 4: chain drive (single strand roller chain is recommended) finf its service factor,design power ,velocity ratio,required no. of teeth on each sprocket, actual output speed, chain lenth,center distance, chain no and type of lubrication... please help me slove this problem... Thx a lot~