Double integral, change order of integration, int(0,1)int(y,1)(e^(-x^2)*y^2)dxdy

Click For Summary
SUMMARY

The discussion centers on solving the double integral int(0,1)int(y,1)(e^(-x^2)*y^2)dxdy by changing the order of integration. The correct approach involves integrating with respect to y first, resulting in the limits (0,x) for y and (0,1) for x. The participant's calculated answer is (1-2/e)/6, indicating a successful application of the integration technique. The discussion highlights the importance of understanding the limits of integration when changing the order.

PREREQUISITES
  • Understanding of double integrals
  • Familiarity with changing the order of integration
  • Knowledge of exponential functions and their properties
  • Basic calculus skills, particularly integration techniques
NEXT STEPS
  • Study the method for changing the order of integration in double integrals
  • Practice solving double integrals with varying limits
  • Explore applications of double integrals in probability and physics
  • Learn about convergence and divergence in multiple integrals
USEFUL FOR

Students preparing for calculus exams, particularly those focusing on integration techniques, as well as educators seeking to clarify double integral concepts.

acapa
Messages
2
Reaction score
0
hey,

i'm having some difficulties solving a problem. i want to know exactly how to go about solving it, since i am studying for a final exam. i know that i need to change the order of integration, but i'd also like to see how it's done correctly, since no official answers are provided... (my answer, btw, is (1-2/e)/6)

int(0,1)int(y,1)(e^(-x^2)*y^2)dxdy

where int(lower limit, upper limit)

thanks so much in advance!
 
Last edited:
Physics news on Phys.org
Changing the order of integration is easy, but I don't see how it helps.

If you want to do y first, then you have (0,1) for x and (0,x) for y.
 
thank you so much!
 

Similar threads

  • · Replies 11 ·
Replies
11
Views
3K
  • · Replies 3 ·
Replies
3
Views
3K
  • · Replies 6 ·
Replies
6
Views
2K
  • · Replies 12 ·
Replies
12
Views
3K
  • · Replies 24 ·
Replies
24
Views
5K
  • · Replies 8 ·
Replies
8
Views
4K
  • · Replies 2 ·
Replies
2
Views
4K
  • · Replies 6 ·
Replies
6
Views
4K
  • · Replies 3 ·
Replies
3
Views
3K
  • · Replies 4 ·
Replies
4
Views
3K