What is the Work Required to Raise a Chain to a Given Height?

  • Thread starter Thread starter Sidthewall
  • Start date Start date
  • Tags Tags
    Integration Work
Join the discussion
Registration is free. Ask a follow-up in this thread, or start your own.
1 reply · 1K views
Sidthewall
Messages
33
Reaction score
0

Homework Statement



A chain lyinh on the ground is 10 m long and its mass 80 kg. How much work is required to raise one end of the chain to a height of 6m.

Homework Equations



W = F x d
= mg x d
W = integral of mg dx from 1 to 6

The Attempt at a Solution


since mass is 80 kg and length is 10 m, linear density is 8kg/m

therefore m = 8 * change in distance
put it together

w = integrel of 8*change in x * 9.8 * dx from 0 to 6
= 78.4 * change in x * dx from 0 to 6
= 1411.2 Joules

AM i right?

p.s. sorry i am new at this i don't know how to get the actual functions for this
 
Physics news on Phys.org
The result is correct. That "change of x" is the length of chain in air, and it is "x", the integration variable.

ehild