Physics 11 Force and potential energy

Join the discussion
Registration is free. Ask a follow-up in this thread, or start your own.
16 replies · 7K views
Iceclover
Messages
59
Reaction score
0

Homework Statement



A constant net force of 410N up is applied to a stone that weighs 32N. The upward force is applied through a distance of 2.0m andthe stone is then released. TO what height from the point of release will the stone rise?

Homework Equations



Ep=mgh

The Attempt at a Solution



Ep=mgh
410=32(h)
h=13m
 
Physics news on Phys.org
I'm not sure where you're going with your solution.
Personally, I'd apply impulse again to get the stone's final velocity at the time of release, and then treat it as one-dimensional motion with constant acceleration.
 
i can't use impulse can I? i don't have a time?
 
Picky, picky...:blushing:

OK, how about the Work-Energy theorem to find the velocity at release?
 
Ek=1/2mv^2? and which force do i use
 
Iceclover said:
Ek=1/2mv^2?

Ah, no. Can you state the Work-Energy Theorem? (If not, can you look it up in your textbook or notes?)
 
An easier way is to use the Work-Energy Theorem, as stated above. Calculate the work done by the force on the stone for the 2m that it is applied (recall, work done = force * distance). When the stone reaches its maximum height, all the energy is the potential energy, so you can equate the potential energy to the work done, and solve for h.
 
Last edited:
Work done on object is equal to the change in its kinetic energy
 
OK, so can you apply it? (I know I can...)
 
what do i do once I've found velocity
 
Use a basic kinematics equation for motion with constant acceleration.
 
the answer i got was 26m
 
ok good, thank you very much
 
do you have time for another question?
 
Not really... but I'm in the middle of studying for my physics final, so this helps me, too. Look, If I don't answer, someone else will. (That's why this forum rocks!)
 
ok sounds good, i think I am going to make a new topic though