I spent some time researching regenerative conveyor systems last spring, for a mining project. From my point of view, I wouldn't try to re-invent the wheel if the project goes ahead, by hiring engineers, etc: I'd just invite the big companies into bid on the design and construction of the conveyor system, etc. There the ones who'll end up building and installing the parts anyways, so they can throw in the engineering and design for less than I could hire a crew to do this from the start.
That's my opinion, at any rate...
The regenerative conveyor is one that carries material down hill, and this part of the conveyor system generates a lot of electricity while doing so. Quite a bit, when one has a 500+ meter fall over about 1 km. The electricity produced could make up nearly 20-25% of the mine's required energy, and cut down CO2 created by diesel-powered equipment (fewer heavy machines, shorter hauls), and reduce the wear and tear on those as a bonus.
We may be able to capture more energy like this, as well, if the project goes ahead, and if other theoretical systems can be engineered and scaled up.