When measuring a variable multiple times with associated errors, the method for calculating a derived quantity depends on the nature of the functions involved. For non-linear functions B and C, the most statistically sound approach is to compute B(C(x)) for each measurement and then average the results. If B and C are linear, alternative methods, such as averaging errors before applying the functions, may yield similar results. However, if the functions exhibit significant curvature relative to the measurement errors, the latter methods could lead to inaccuracies. It's crucial to clarify the specific estimation goal to determine the best calculation method.
mikeph
Messages
1,229
Reaction score
18
Hi,

say I measure something ten times and get x+d1x, x+dx2, ... where dx1, dx2.. are the measurement errors.

Now, say I want to calculate something from these measurements according to:

A = B(C(x)),

Where A is what I want, and B and C are known functions.

Which is statistically the most "sound" way of calculating it?

take the average of the errors, then find B(C(avg))?
take C(x) then take the average and then find B(avg)?
take A(B(x)) of each measurement, then average the result?

Thanks
 
Physics news on Phys.org
If you assume a Gaussian distribution, have small relative errors and B and C are not completely weird, you can propage the relative uncertainty through your functions with Gaussian error propagation (i. e. see how A changes if x changes a little bit, and multiply with your uncertainty).
If those assumptions are bad (or if you just have 10 measurements), you can calculate A for all measurements, and do the analysis on A only.
 
MikeyW said:
Which is statistically the most "sound" way of calculating it?
You didn't say what "it" is. It appears you want to estimate the mean value of B(C(x)).

The mathematically exact way to compute the usual estimator of the mean of B(C(x)) is:
take B(C(x)) of each measurement, then average the result
(You meant to say "B(C(x))" instead of "A(B(x))" )

If B and C are linear functions (such as B(w) = 3w + 2 , C(y) = 6y - 4 ) then you will get the same result as above by using the other two methods:

take the average of the errors, then find B(C(avg))
take C(x) then take the average and then find B(avg)

If B and C are differentiable functions and the errors dx are small enough so that they are well approximated by the linear functions defined by their tangent lines in the vicinity of x, you will get approximately the same answer from all 3 methods. On the other hand if the curvature of B and C is "large" over distances that are typical of your measurement errors, the latter two methods should not be used.

That's the story if the goal is "Estimate the mean value of B(C(x))?" If the question is "Estimate the value of B(C(w)) evaluated at w = the mean of x?" then B(C(avg)) seems like the natural answer. So it's important that you ask a specific question. Say what you are trying to estimate.
 
That's a good question, I don't know exactly what I want. The data is noisy, so I'd like to get a result that's closest to the noiseless case. What's confusing me is that I thought taking the average and then doing the analysis would give the best result, but it doesn't.

B and C: both non-linear, non-analytic and I'd afraid I'm not 100% certain that they're continuous, but they are deterministic. They're non-linear regression fit parameters, but they do tend to amplify "seemingly" random errors in the data.

I suppose the trade off lies between having a value of A that is due to a single smaller-error measurement, or an average of As due to many larger-error measurements, and the fact that A is not necessarily continuous might mean the latter is a better option...
 
It sounds like you are doing a curve fit of some kind. If that's the case you should explain the details. Your original question seems irrelevant to doing a curve fit.
 
I was reading documentation about the soundness and completeness of logic formal systems. Consider the following $$\vdash_S \phi$$ where ##S## is the proof-system making part the formal system and ##\phi## is a wff (well formed formula) of the formal language. Note the blank on left of the turnstile symbol ##\vdash_S##, as far as I can tell it actually represents the empty set. So what does it mean ? I guess it actually means ##\phi## is a theorem of the formal system, i.e. there is a...